Scott SPARK 60 2010 VS Merlin CRITICAL PATH 1998 specs comparison
![Scott Spark 60 2010 comparison online with competitors](https://yobicycle.com/images/models/Scott-Spark-60-2010-specs.jpg)
Scott Spark 60
General InfosModel | Spark 60 |
Manufacturer | Scott |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-White and Red |
Sizes |
- S - M - L - XL |
Sizes |
- S - M - L - XL |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Schwalbe Rocket Ron and 50 TPI Kevlar Bead Front: 26 X 2.10 (inches) Schwalbe Rocket Ron and 50 TPI Kevlar Beadple Compound |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | 180 (millimeters) Centerlock Rotor Front and Shimano BR-M486 Hydraulic With 160 (millimeters) Rotor Rear Brakes Shimano BL-M486 Levers Shimano BR-M486 Hydraulic Disc |
Hubs for disc brakes | Rear: Shimano FH-RM65 CL Front: Scott Team Disc CL |
Rims manufacturer | 32-hole Alex XC-44 Disc |
Spoke nipples type | Not Available |
Spoke wheel | 15ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | Scott Spark Alloy 6061 DB Hydrofrom Monocoque |
Frame type | TIG-welded |
Handlebar construction | Scott Pilot 18 Team 18 (millimeters) Rise and 640 (millimeters) Width |
Handlebar extender | Optional |
Handlebar stem details | Scott Comp OS 6-degree |
Headset size | 1 1/8 (inches) Semi-ntegrated Ritchey OE 44/50 (millimeters) |
Gearing Specifications
Bicycle chain | Shimano CN-HG53 |
Bottom bracket shell width | 68 (millimeters) |
Bottom bracket type | 121 (millimeters) Spindle Shimano ES-25 |
Crankset parts and sizes | 22/32/44 Teeth Shimano FC-M442 |
Gear shift levers | Shimano Deore SL-M590 R-fire Plus 2 |
Rear gear set | 11 - 32 Teeth 9-speed |
Scott Spark 60 Fork System Data
Derailleur (Front) | Clamp On 34.9 (millimeters) Shimano Deore FC-M591 |
Derailleur (Rear) | Shimano SLX Shadow RD-M662 |
Fork material | Single |
Fork type | 120 (millimeters) Travel RockShox Tora SL Coil |
Other Specs of Scott Spark 60
Component group sets | Mountain Mix |
Pedals details | Wellgo LU-998-S |
Rear shock absorber | 110 (millimeters) Travel DT Swiss M210 and Air and Reb. Reb. With Lockout |
Saddle seat | Scott Racing |
Seat post extension | 31.6 (millimeters) Diameter Scott Comp |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Scott provided us with the latest version of its Spark 60 bike manual
- Find All parts, tires and accessories of Scott Spark 60 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here