Scott SPARK RC 2009 VS Merlin CRITICAL PATH 1998 specs comparison
Scott Spark RC
General InfosModel | Spark RC |
Manufacturer | Scott |
Year of production | 2009 |
Current price | Check price Here ==> |
Color choice |
-Carbon and White and Yellow |
Sizes |
- Small - Medium - Large - Extra large |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.25 (inches) Schwalbe Rocket Ron |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy Ultimate Carbon Levers Avid Juicy Ultimate With 185 (millimeters) Rotor Front and Avid Juicy Ultimate With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Rear: DT Swiss 240S Disc Front: DT Swiss Disc |
Rims manufacturer | 32-hole DT Swiss 4.2 Disc |
Spoke nipples type | Not Available |
Spoke wheel | DT Swiss Super Comp |
Frame and Body Specs
Frame materials | IMP4/HMX Net Carbon Fiber |
Frame type | Monocoque |
Handlebar construction | Ritchey Carbon WCS |
Handlebar extender | Optional |
Handlebar stem details | Ritchey WCS 4-Axis 44 OS |
Headset size | 1 1/8 (inches) Ritchey WCS Carbon |
Gearing Specifications
Bicycle chain | Shimano HG93 |
Bottom bracket shell width | 73 (millimeters) |
Bottom bracket type | Truvativ GXP Team |
Crankset parts and sizes | 22/32/44 Teeth TruVativ Noir 3.3 Team Carbon GXP |
Gear shift levers | SRAM X.0 Trigger |
Rear gear set | 11 - 32 Teeth 9-speed |
Scott Spark RC Fork System Data
Derailleur (Front) | Shimano XTR |
Derailleur (Rear) | SRAM X.0 |
Fork material | Single Crown Magnesium and aluminum |
Fork type | 100 (millimeters) Travel RockShox SID Team |
Other Specs of Scott Spark RC
Component group sets | SRAM X.0/mix |
Pedals details | Crank Brothers Eggbeater SL |
Rear shock absorber | 110 (millimeters) Travel Scott Nude TC |
Saddle seat | Selle Italia SLR XP Kevlar With Carbon Rails |
Seat post extension | 34.9 (millimeters) Diameter Ritchey WCS Carbon |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Scott provided us with the latest version of its Spark RC bike manual
- Find All parts, tires and accessories of Scott Spark RC Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here