Specialized BIGHIT 1 2008 VS Merlin CRITICAL PATH 1998 specs comparison
Specialized Bighit 1
General InfosModel | Bighit 1 |
Manufacturer | Specialized |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-Tan and Black |
Sizes |
- Small - medium - large |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | 26 X 2.30 (inches) Specialized Chunder |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | 203 (millimeters) Rotor Brakes Hayes Stroker Trail Levers Hayes Stroker Trail |
Hubs for disc brakes | Rear: Specialized Bolt-on 135 (millimeters) Bolt-on 9 (millimeters) Cr-Mo Axle With RD Guard Front: Specialized Disc |
Rims manufacturer | 36-hole Specialized P-Disc |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | A1 Premium Aluminum |
Frame type | TIG-welded |
Handlebar construction | 31.8 (millimeters) 6061 Alloy 680 (millimeters) Wide Specialized Big Hit Rise Bar |
Handlebar extender | Optional |
Handlebar stem details | TruVativ Holzfeller |
Headset size | 1 1/8 (inches) Threadless Oversize Threaded |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano IG-31 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Truvativ Ruktion |
Crankset parts and sizes | 170 (millimeters) With SBC Chain Guide 34 Teeth Truvativ Ruktion |
Gear shift levers | SRAM SX-5 Trigger |
Rear gear set | 11 - 32 Teeth 8-speed |
Specialized Bighit 1 Fork System Data
Derailleur (Front) | Not Available |
Derailleur (Rear) | SRAM X.7 |
Fork material | Single |
Fork type | 160 (millimeters) Travel Marzocchi Z1 Sport |
Other Specs of Specialized Bighit 1
Component group sets | Downhill Mix |
Pedals details | Alloy Platform |
Rear shock absorber | 7.5 (inches) Travel Fox Vanilla R Coil |
Saddle seat | 8 (millimeters) Cr-Mo Rails Specialized Enduro |
Seat post extension | 30.9 (millimeters) Diameter Two Bolt Setback 6061 Butted Alloy |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Specialized provided us with the latest version of its Bighit 1 bike manual
- Find All parts, tires and accessories of Specialized Bighit 1 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here