Specialized BIGHIT FSR II 2006 VS Merlin CRITICAL PATH 1998 specs comparison

Specialized Bighit FSR II 2006 comparison online with competitors

Specialized Bighit FSR II

General Infos
Model Bighit FSR II
Manufacturer Specialized
Year of production 2006
Current price Check price Here ==>   
Color choice -Not found
Sizes - Not available
Sizes - Not available

Wheels And Breaking System

Bike front tire 2 Ply
Soft Compound
26 X 2.30 (inches) Specialized Chunder 60TPI
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 5 Levers
Hydraulic Disc Brake 8 (inches) Polygon Rotor Front and Avid Juicy 5
Hydraulic Disc With 8 (inches) Polygon Rotor Rear Brakes
Avid Juicy 5
Hubs for disc brakes 135 (millimeters) Spacing
20 (millimeters) Thru Axle
Rear: Specialized Disc
Bolt On Axle
Front: Specialized Disc
Rims manufacturer 36-hole
Sun Single Track SL-1
Spoke nipples typeBrass Nipples
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materials6061 aluminum c
Frame typeTIG-welded
Handlebar construction 31.8 (millimeters)
6 Degree Up
6061 Alloy
9 Degree Back
Specialized Demo Rise Bar
Handlebar extenderOptional
Handlebar stem details 31.8 Clamp
5 Degree X 40 (millimeters)
Black
Forged and CNC Stem
Truvativ Hussefelt
Headset size OS Cro-Mo Cups
1 1/8 (inches) Threadless

Gearing Specifications

Bicycle chainSRAM PC-971 With Power Link
Bottom bracket shell width73 (millimeters) English
Bottom bracket typeTruvativ Howitzer XR
Crankset parts and sizes 170 (millimeters) With Truvativ Chain Guide
34 Teeth
Truvativ Hussefelt
Gear shift levers 9-speed
SRAM X-7 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Specialized Bighit FSR II Fork System Data

Derailleur (Front)Not Available
Derailleur (Rear) Micro Cage
SRAM X-9
Fork material Single Crown
Magnesium and aluminum and steel
Fork typeMarzocchi Drop-Off Triple

Other Specs of Specialized Bighit FSR II

Component group setsSRAM Mix
Pedals details 3 (millimeters) Pressed Pins
9/16 (inches) Cr-Mo Axle
Alloy Platform
Rear shock absorber 190 (millimeters) Travel
8.75x2.5 (inches)
Fox Vanilla R Coil
Saddle seat 8 (millimeters) Steel Rails
With X-Brace
Specialized Freeride
Seat post extensionTitec Scoper Telescopic


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....