Specialized CAMBER FSR COMP 2011 VS Merlin CRITICAL PATH 1998 specs comparison
![Specialized Camber FSR Comp 2011 comparison online with competitors](https://yobicycle.com/images/models/Specialized-Camber-FSR-Comp-2011-specs.jpg)
Specialized Camber FSR Comp
General InfosModel | Camber FSR Comp |
Manufacturer | Specialized |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice |
- Wht and Blk and Gld -Sil and Char |
Sizes |
- Small - Medium - Large - Extra large |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.0 (inches) Specialized The Captain Sport |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Tektro Draco Levers Tektro Draco Brakes |
Hubs for disc brakes | Specialized Hi Lo Disc |
Rims manufacturer | 28-hole and 32-hole DT Swiss 445D |
Spoke nipples type | Not Available |
Spoke wheel | 15ga. Butted Stainless |
Frame and Body Specs
Frame materials | M4 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Specialized XC Low Rise |
Handlebar extender | Optional |
Handlebar stem details | Specialized XC |
Headset size | 1 1/8 (inches) Threadless Campy Spec Integrated Sealed Cartridge Bearing |
Gearing Specifications
Bicycle chain | KMC X9 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano BB ES25 Octalink |
Crankset parts and sizes | 22/32/44 Teeth Shimano FC-M430 |
Gear shift levers | Shimano Alivio |
Rear gear set | 11 - 34 Teeth 9-speed |
Specialized Camber FSR Comp Fork System Data
Derailleur (Front) | E-type Shimano SLX |
Derailleur (Rear) | Shimano SLX |
Fork material | Single Crown Alloy Steerer |
Fork type | 120 (millimeters) Travel RockShox Recon Silver TK |
Other Specs of Specialized Camber FSR Comp
Component group sets | Mountain Mix |
Pedals details | Resin Test Ride Pedals |
Rear shock absorber | 120 (millimeters) Travel RockShox Ario RL |
Saddle seat | Specialized BG Rival |
Seat post extension | 30.9 (millimeters) Diameter Alloy Double Bolt |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Specialized provided us with the latest version of its Camber FSR Comp bike manual
- Find All parts, tires and accessories of Specialized Camber FSR Comp Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here