Specialized EPIC RIM 2006 VS Merlin CRITICAL PATH 1998 specs comparison
Specialized Epic Rim
General InfosModel | Epic Rim |
Manufacturer | Specialized |
Year of production | 2006 |
Current price | Check price Here ==> |
Color choice |
-Not found |
Sizes |
- Small - Medium - Large - Extra large |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | Aramid Bead Dual Compound 26 X 2.00 (inches) Specialized Fast Trak Pro |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid FR-5 Levers Cantilever Cartridge Pads Brakes Avid SD-5R |
Hubs for disc brakes | Rear: Shimano M-525 Alloy QR High and low Flange Sealed Cartridge Bearing Front: Specialized Stout Disc |
Rims manufacturer | 32-hole Mavic X317 |
Spoke nipples type | Alloy |
Spoke wheel | 15ga. Straight Gauge DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | M5 Aluminum |
Frame type | TIG-welded |
Handlebar construction | 31.8 (millimeters) 600 (millimeters) Width Specialized 2014 Butted Alloy Flat Bar |
Handlebar extender | Optional |
Handlebar stem details | 31.8 (millimeters) OS Clamp 4-bolt Face Plate 8 Degree Rise 3D Forged CNC Machined |
Headset size | 10 (millimeters) Insertion Alloy Cups Sealed Cartridge Bearing 1 1/8 (inches) Threadless |
Gearing Specifications
Bicycle chain | SRAM PC-971 With Power Link |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ GXP |
Crankset parts and sizes | 2-piece 22S and 32A and 44A Teeth Truvativ Stylo |
Gear shift levers | Shimano Deore LX |
Rear gear set | 11 - 34 Teeth 9-speed |
Specialized Epic Rim Fork System Data
Derailleur (Front) | 34.9 (millimeters) Clamp Bottom Swing Dual Pull Shimano M-580 LX |
Derailleur (Rear) | Long Cage Standard Spring Shimano M-750 XT |
Fork material | Single Crown Magnesium and aluminum |
Fork type | 100 (millimeters) Fox F100 RL |
Other Specs of Specialized Epic Rim
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M520 SPD |
Rear shock absorber | 100 (millimeters) Travel Specialized Fox Brain Fade Shock |
Saddle seat | Hollow Cr-Mo Rails Specialized Body Geometry Rival |
Seat post extension | 30.9 (millimeters) Diameter Aluminum |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Specialized provided us with the latest version of its Epic Rim bike manual
- Find All parts, tires and accessories of Specialized Epic Rim Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here