Specialized FSR XC PRO 2004 VS Merlin CRITICAL PATH 1998 specs comparison

Specialized FSR XC Pro 2004 comparison online with competitors

Specialized FSR XC Pro

General Infos
Model FSR XC Pro
Manufacturer Specialized
Year of production 2004
Current price Check price Here ==>   
Color choice -Silver
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Specialized Roll-X
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid FR-1 Levers
Avid Single Digit 3 Brakes
Hubs for disc brakes Rear: Shimano HB-M475 Disc
Front: Specialized Disc
Rims manufacturer 28-hole and 32-hole
Mavic XM117
Spoke nipples typeBrass Nipples
Spoke wheel 15ga. Straight Gauge
DT Stainless Steel

Frame and Body Specs

Frame materials Double Butted
Specialized A1 Aluminum
Frame typeTIG-welded
Handlebar constructionSpecialized Aluminum
Handlebar extenderOptional
Handlebar stem detailsSpecialized Riser
Headset size1 1/8 (inches) Threadless Aluminum

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG53
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 121 (millimeters) Spindle
Shimano BB-ES30
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore XT
Gear shift leversShimano Deore RapidFire
Rear gear set 11 - 34 Teeth
9-speed

Specialized FSR XC Pro Fork System Data

Derailleur (Front) Clamp-on and 34.9 (millimeters)
Shimano Deore
Derailleur (Rear)Shimano Deore XT SGS
Fork material Single Crown
Aluminum
Fork type 100 (millimeters) Travel
Answer Manitou Axel Elite

Other Specs of Specialized FSR XC Pro

Component group setsMountain Mix
Pedals detailsAluminum Platform
Rear shock absorberFox Float R
Saddle seatSpecialized Body Geometry
Seat post extension 30.9 (millimeters) Diameter
Aluminum


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....