Specialized PITCH COMP 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Specialized Pitch Comp 2010 comparison online with competitors

Specialized Pitch Comp

General Infos
Model Pitch Comp
Manufacturer Specialized
Year of production 2010
Current price Check price Here ==>   
Color choice - Blue
-Brown
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.30 (inches) Specialized Eskar Sport
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes Stroker Ryde Hydraulic Levers
Hayes Stroker Ryde With 203 (millimeters) Rotor Front and Hayes Stroker Ryde With 185 (millimeters) Rotor Rear Brakes
Hubs for disc brakes Rear: Shimano M475L
Front: Specialized Stout Disc
Rims manufacturer 32-hole
Alex RHD 26
Spoke nipples typeAlloy
Spoke wheel 15ga.
Stainless

Frame and Body Specs

Frame materialsSpecialized M4 ORE Aluminum
Frame typeTIG-welded
Handlebar construction 31.8 (millimeters)
660 (millimeters) Wide
Butted
Specialized Mid Rise
Handlebar extenderOptional
Handlebar stem detailsSpecialized 3D Forged 31.8
Headset size1 1/8 (inches) Threadless

Gearing Specifications

Bicycle chainKMC HG-73
Bottom bracket shell width68 (millimeters)
Bottom bracket type 118 (millimeters) Spindle
Shimano BB-ES25 Octalink
Crankset parts and sizes 22/32/44 Teeth
Shimano M521
Gear shift leversSRAM X.5 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Specialized Pitch Comp Fork System Data

Derailleur (Front) E-type
Shimano LX
Derailleur (Rear)SRAM X.7
Fork material Single Crown
Magnesium and aluminum
Fork type 140 (millimeters) Travel
RockShox Pike 327

Other Specs of Specialized Pitch Comp

Component group setsSRAM Mix
Pedals detailsSpecialized Alloy
Rear shock absorber 150 (millimeters) Travel
X Fusion 02R
Saddle seatSpecialized Enduro
Seat post extension 30.9 (millimeters) Diameter
6061 Alloy Two-bolt


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....