Specialized S-WORKS EPIC CARBON DISC 2010 VS Merlin CRITICAL PATH 1998 specs comparison

Specialized S-Works Epic Carbon Disc 2010 comparison online with competitors

Specialized S-Works Epic Carbon Disc

General Infos
Model S-Works Epic Carbon Disc
Manufacturer Specialized
Year of production 2010
Current price Check price Here ==>   
Color choice - Red
-Carbon
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire Rear: 26 X 2.00 (inches) Specialized S-Works Fast Trak LK
Front: 26 X 2.00 (inches) Specialized S-Works The Captain
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid XX Hydraulic Levers
Avid XX Hydraulic Disc Brakes
Hubs for disc brakes Rear: Roval Controle SL XC
Front: Roval Controle SL XC Carbon
Rims manufacturerRoval Controle SL Disc
Spoke nipples typeNot Available
Spoke wheelDT Aerolite

Frame and Body Specs

Frame materialsCarbon and Aluminum
Frame typeCarbon
Handlebar constructionS-Works XC Carbon Low Rise
Handlebar extenderNot Available
Handlebar stem detailsSyntace F109 31.8
Headset size1 1/8 (inches) - 1 1/2 (inches) Campy Spec Integrated Sealed Cartridge Bearing

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
SRAM PG-1090
Bottom bracket shell widthNot Available
Bottom bracket typeS-Works Integrated Oversized
Crankset parts and sizes 26/39 Teeth
S-Works OS Carbon
Gear shift leversSram X.X
Rear gear set 11 - 36 Teeth
10-speed

Specialized S-Works Epic Carbon Disc Fork System Data

Derailleur (Front) DMD
Sram X.X
Derailleur (Rear)Sram XX
Fork materialNot Available
Fork type 100 (millimeters) Travel
Specialized Future Shock E100

Other Specs of Specialized S-Works Epic Carbon Disc

Component group setsNot Available
Pedals detailsOptional
Rear shock absorber 100 (millimeters) Travel
Fox and SBC Remote Mini-Brain
Saddle seatSpecialized Phenom SL
Seat post extension 30.9 (millimeters) Diameter
S-Works Carbon


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....