Specialized S-WORKS FSR XC 2000 VS Merlin CRITICAL PATH 1998 specs comparison
![Specialized S-Works FSR XC 2000 comparison online with competitors](https://yobicycle.com/images/models/Specialized-S-Works-FSR-XC-2000-specs.jpg)
Specialized S-Works FSR XC
General InfosModel | S-Works FSR XC |
Manufacturer | Specialized |
Year of production | 2000 |
Current price | Check price Here ==> |
Color choice |
- Team Red -Anodized Black |
Sizes |
- Small - Medium - Large - Extra large |
Sizes |
- Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | Rear: 26 X 1.90 (inches) Specialized Mount Baldy Team Front: 26 X 1.90 (inches) Specialized Dirt Control |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | S-Works STOUT |
Rims manufacturer | 28-hole and 32-hole Mavic X517 |
Spoke nipples type | Alloy |
Spoke wheel | 1.8 (millimeters) Double-butted DT Stainless Steel |
Frame and Body Specs
Frame materials | Specialized M4 Metal Matrix |
Frame type | TIG-welded |
Handlebar construction | S-Works Wide Boy |
Handlebar extender | Optional |
Handlebar stem details | S-Works Alloy |
Headset size | 1 1/8 (inches) Threadless Tange-Seiki SE |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG92 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano Cartridge |
Crankset parts and sizes | 22/32/44 Teeth S-Works Forged |
Gear shift levers | Shimano Deore XT RapidFire SL |
Rear gear set | 11 - 32 Teeth 9-speed |
Specialized S-Works FSR XC Fork System Data
Derailleur (Front) | Shimano Deore XT Top-swing |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Carbon Fiber and magnesium |
Fork type | 3.15 (inches) Travel Answer Manitou MARS CL |
Other Specs of Specialized S-Works FSR XC
Component group sets | Mountain Mix |
Pedals details | Specialized Team Clipless Ti |
Rear shock absorber | 3.0 (inches) Travel Fox Float RC |
Saddle seat | Specialized Revolution |
Seat post extension | 30.9 (millimeters) Diameter Thomson Elite |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Specialized provided us with the latest version of its S-Works FSR XC bike manual
- Find All parts, tires and accessories of Specialized S-Works FSR XC Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here