Specialized STUMPJUMPER FSR EXPERT 29ER 2011 VS Merlin CRITICAL PATH 1998 specs comparison

Specialized Stumpjumper FSR Expert 29er 2011 comparison online with competitors

Specialized Stumpjumper FSR Expert 29er

General Infos
Model Stumpjumper FSR Expert 29er
Manufacturer Specialized
Year of production 2011
Current price Check price Here ==>   
Color choice -Blk and polish
Sizes - Medium
- large
- xlarge
- xxlarge
Sizes - Medium
- large
- xlarge
- xxlarge

Wheels And Breaking System

Bike front tire Rear: 29 X 2.2 (inches) Specialized The Captain Control
Front: 29 X 2.2 (inches) S-Works Purgatory
Bike rear tireNot Available
Bike wheel size29 (inches) Wheels
Brakeset type Avid Elixir CR SL Levers
Avid Elixir CR SL Brakes
Hubs for disc brakes Rear: DT Swiss 330SL
Front: Specialized Hi Lo Disc
Rims manufacturer 32-hole and 36-hole
DT Swiss 520SL
Spoke nipples typeNot Available
Spoke wheel 1.8/1.6 Double-butted
DT Swiss Competition Stainless

Frame and Body Specs

Frame materialsM5 Aluminum
Frame typeTIG-welded
Handlebar constructionSpecialized XC Flat 31.8 (millimeters)
Handlebar extenderOptional
Handlebar stem detailsSpecialized XC
Headset size1 1/8 (inches) - 1 1/2 (inches) Campy Spec Integrated Sealed Cartridge Bearing

Gearing Specifications

Bicycle chainKMC X10
Bottom bracket shell widthNot Available
Bottom bracket typeSRAM GXP
Crankset parts and sizes 22/33 Teeth
SRAM Carbon S-2200
Gear shift leversSRAM X.9
Rear gear set 11 - 36 Teeth
10-speed

Specialized Stumpjumper FSR Expert 29er Fork System Data

Derailleur (Front) E-type
Shimano SLX
Derailleur (Rear)SRAM X.0
Fork material Single Crown
Alloy Steerer
Fork type 130 (millimeters) Travel
RockShox Reba RLT 29

Other Specs of Specialized Stumpjumper FSR Expert 29er

Component group setsMountain Mix
Pedals detailsResin Test Ride Pedals
Rear shock absorber 130 (millimeters) Travel
Fox Brain
Saddle seatSpecialized BG Henge Comp
Seat post extension Height Adjustable
Specialized Co (millimeters)and Post


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....