Specialized SX TRAIL II 2008 VS Merlin CRITICAL PATH 1998 specs comparison

Specialized SX Trail II
General InfosModel | SX Trail II |
Manufacturer | Specialized |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-Orange and Black |
Sizes |
- Small - medium - large |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | 26 X 2.30 (inches) Specialized Chunder |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | 185 (millimeters) Rotor Rear Brakes 203 (millimeters) Rotor Front and Avid Code 7 Avid Code 7 Hydraulic Disc Hydraulic Disc Hydraulic Disc Levers Avid Code 7 |
Hubs for disc brakes | 20 (millimeters) Thru Axle Rear: Specialized Bolt-on 135 (millimeters) Solid 10 (millimeters) 7075 Alloy Axle With RD Guard Front: Specialized Stout Disc |
Rims manufacturer | 36-hole DT Swiss EX5.1D |
Spoke nipples type | Alloy Niples |
Spoke wheel | 14/15ga. Double-butted DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | A1 Premium Aluminum |
Frame type | TIG-welded |
Handlebar construction | 2014 Alloy 31.8 (millimeters) 660 (millimeters) Wide Specialized Enduro Mid Rise |
Handlebar extender | Optional |
Handlebar stem details | TruVativ Holzfeller |
Headset size | 1 1/8 (inches) Threadless Threadless |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) SRAM PC-971 With Power Link |
Bottom bracket shell width | 73 (millimeters) English |
Bottom bracket type | Truvativ Holzfeller Team |
Crankset parts and sizes | 24/36 Teeth Truvativ Holzfeller With BlackSpire Stinger Shift Guide |
Gear shift levers | SRAM X-7 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Specialized SX Trail II Fork System Data
Derailleur (Front) | Dual-pull and clamp-on 34.9 (millimeters) Shimano LX |
Derailleur (Rear) | SRAM X-0 |
Fork material | Single Crown Aluminum |
Fork type | 160 (millimeters) Travel Fox 36 Van RC2 |
Other Specs of Specialized SX Trail II
Component group sets | Mountain Mix |
Pedals details | Screw In Pins Specialized Lo-Pro Mag |
Rear shock absorber | 170 (millimeters) Travel Fox DHX 5.0 Coil Over |
Saddle seat | 8 (millimeters) Cr-Mo Rails Specialized Enduro |
Seat post extension | 30.9 (millimeters) Diameter Thomson |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Specialized provided us with the latest version of its SX Trail II bike manual
- Find All parts, tires and accessories of Specialized SX Trail II Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here