Supercross BUZZ BOMB VERTICLA 6 DH 1997 VS Merlin CRITICAL PATH 1998 specs comparison
Supercross Buzz Bomb Verticla 6 DH
General InfosModel | Buzz Bomb Verticla 6 DH |
Manufacturer | Supercross |
Year of production | 1997 |
Current price | Check price Here ==> |
Color choice |
-White |
Sizes |
- 16 (inches) - 18 (inches) |
Sizes |
- 16 (inches) - 18 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.20 (inches) Hutchinson |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Formula Hydraulic Levers Formula Hydraulic Disk Brakes |
Hubs for disc brakes | Rear: Sachs 3 X 7 Front: Supercross Fat Boy |
Rims manufacturer | 36-hole Velocity |
Spoke nipples type | Splined Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Straight Gauge Marwi Stainless Steel |
Frame and Body Specs
Frame materials | 6061 T6/6013 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Supercross Buzz Bomb DH |
Handlebar extender | Optional |
Handlebar stem details | Answer A-tac |
Headset size | 1 1/8 (inches) Threadless Cane Creek |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) KMC SS-91S |
Bottom bracket shell width | American |
Bottom bracket type | 124.5 (millimeters) Spindle Supercross Sealed Cartridge |
Crankset parts and sizes | 48 Teeth Supercross PowerDrive 3-piece |
Gear shift levers | Sachs Power Grip Extreme |
Rear gear set | 11 - 28 Teeth 3-speed Internal X 7-speed |
Supercross Buzz Bomb Verticla 6 DH Fork System Data
Derailleur (Front) | Not Available |
Derailleur (Rear) | Sachs Quarz |
Fork material | Optional |
Fork type | Optional |
Other Specs of Supercross Buzz Bomb Verticla 6 DH
Component group sets | Sachs Quarz |
Pedals details | Tech Prochoice Clipless |
Rear shock absorber | 6.0 (inches) Travel Cane Creek AD-8 |
Saddle seat | Supercross Weighlite Kevlar |
Seat post extension | 27.2 (millimeters) Diameter Supercross Thermo-plastic Micro-adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Supercross provided us with the latest version of its Buzz Bomb Verticla 6 DH bike manual
- Find All parts, tires and accessories of Supercross Buzz Bomb Verticla 6 DH Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here