Titus LOCO-MOTO COIL BASIC 2002 VS Merlin CRITICAL PATH 1998 specs comparison

Titus Loco-Moto Coil Basic 2002 comparison online with competitors

Titus Loco-Moto Coil Basic

General Infos
Model Loco-Moto Coil Basic
Manufacturer Titus
Year of production 2002
Current price Check price Here ==>   
Color choice -All colors available
Sizes - Large
- medium
- small
- xsmall
Sizes - Large
- medium
- small
- xsmall

Wheels And Breaking System

Bike front tireIRC
Bike rear tireNot Available
Bike wheel sizeNot Available
Brakeset type Shimano Deore LX Levers
Avid Single Digit 7 Brakes
Hubs for disc brakesBontrager Select
Rims manufacturer 24-hole and 28-hole
Bontrager Superstock
Spoke nipples typeNot Available
Spoke wheel Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materialsAluminum
Frame typeTIG-welded
Handlebar constructionBontrager Select
Handlebar extenderOptional
Handlebar stem detailsEaston EA50
Headset size1 1/8 (inches) Threadless Dia-Compe SAS

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell width73 (millimeters) English
Bottom bracket typeShimano BB-ES50
Crankset parts and sizes 22/32/44 Teeth
Race Face Prodigy
Gear shift leversShimano Deore LX RapidFire
Rear gear set 11 - 32 Teeth
9-speed

Titus Loco-Moto Coil Basic Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano Deore LX
Derailleur (Rear)Shimano Deore XT
Fork material Single Triple-clamp Crown
Aluminum
Fork type 3.15 (inches)-4.0 (inches) Adjustable Travel
Rock Shox Judy SL

Other Specs of Titus Loco-Moto Coil Basic

Component group setsMountain Mix
Pedals detailsOptional
Rear shock absorber 4.0 (inches)-4.75 (inches) Adjustable Travel
Fox Vanilla R
Saddle seatBontrager FS 2000
Seat post extension 27.2 (millimeters) Diameter
Bontrager Select


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....