Titus RACER X EXO CUSTOM (ALL-MOUNTAIN I KIT) 2006 VS Merlin CRITICAL PATH 1998 specs comparison
Titus Racer X Exo Custom (All-Mountain I Kit)
General InfosModel | Racer X Exo Custom (All-Mountain I Kit) |
Manufacturer | Titus |
Year of production | 2006 |
Current price | Check price Here ==> |
Color choice |
-Titanium |
Sizes |
- Custom |
Sizes |
- Custom |
Wheels And Breaking System
Bike front tire | Kenda |
Bike rear tire | Not Available |
Bike wheel size | Not Available |
Brakeset type | Avid Juicy 5 Levers Avid Juicy 5 Brakes |
Hubs for disc brakes | DT XR4.1 Disc |
Rims manufacturer | DT Swiss XR 4.1 D |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | Titus Exogrid Ti and Carbon |
Frame type | TIG-welded and bonded |
Handlebar construction | Titus 6061 Riser |
Handlebar extender | Not Available |
Handlebar stem details | Titus Forged |
Headset size | 1 1/8 (inches) Threadless WTB Momentum Comp ST |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG93 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Truvativ GXP |
Crankset parts and sizes | Truvativ Stylo XR |
Gear shift levers | SRAM X-7 |
Rear gear set | 11 - 34 Teeth 9-speed |
Titus Racer X Exo Custom (All-Mountain I Kit) Fork System Data
Derailleur (Front) | Shimano Deore XT |
Derailleur (Rear) | SRAM X.9 |
Fork material | Single Crown Aluminum and magnesium |
Fork type | 100 (millimeters) Travel Fox Float R |
Other Specs of Titus Racer X Exo Custom (All-Mountain I Kit)
Component group sets | Mountain Mix |
Pedals details | Not Available |
Rear shock absorber | 4 (inches) Travel |
Saddle seat | WTB Rocket V Comp |
Seat post extension | Titus Micro-adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Titus provided us with the latest version of its Racer X Exo Custom (All-Mountain I Kit) bike manual
- Find All parts, tires and accessories of Titus Racer X Exo Custom (All-Mountain I Kit) Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here