Titus RACER X EXO (ULTIMATE RACE KIT) 2006 VS Merlin CRITICAL PATH 1998 specs comparison

Titus Racer X Exo (Ultimate Race Kit) 2006 comparison online with competitors

Titus Racer X Exo (Ultimate Race Kit)

General Infos
Model Racer X Exo (Ultimate Race Kit)
Manufacturer Titus
Year of production 2006
Current price Check price Here ==>   
Color choice -Titanium
Sizes - Xxsmall
- xsmall
- small
- medium
- large
- xlarge
Sizes - Xxsmall
- xsmall
- small
- medium
- large
- xlarge

Wheels And Breaking System

Bike front tireKenda
Bike rear tireNot Available
Bike wheel sizeNot Available
Brakeset type Magura Marta SL Carbon Levers
Magura Marta SL Carbon Brakes
Hubs for disc brakesDT 240S Disc
Rims manufacturerDT 240S Disc
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsTitus Exogrid Ti and Carbon
Frame typeTIG-welded and bonded
Handlebar constructionFSA Carbon and Maxm Carbon
Handlebar extenderNot Available
Handlebar stem detailsTitus Machined
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano XTR
Bottom bracket shell widthNot Available
Bottom bracket typeShimano XTR
Crankset parts and sizesShimano XTR M960
Gear shift leversSRAM X.0 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Titus Racer X Exo (Ultimate Race Kit) Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)SRAM X.0 Carbon
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters) Travel
Fox F100RLT

Other Specs of Titus Racer X Exo (Ultimate Race Kit)

Component group setsMountain Mix
Pedals detailsNot Available
Rear shock absorber4 (inches) Travel
Saddle seatTitus Ti-Rail
Seat post extensionFSA K-Force Lite and Maxm Carbon


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....