Tomac REVOLVER COMP 2003 VS Merlin CRITICAL PATH 1998 specs comparison

Tomac Revolver Comp 2003 comparison online with competitors

Tomac Revolver Comp

General Infos
Model Revolver Comp
Manufacturer Tomac
Year of production 2003
Current price Check price Here ==>   
Color choice -Not found
Sizes - Large
- medium
- medium/large
- small
Sizes - Large
- medium
- medium/large
- small

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) Kenda Karma
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Magura Julie Hydraulic Disc Levers
Magura Julie Hydraulic Disc Brakes
Hubs for disc brakesShimano Deore XT Disc
Rims manufacturer 32-hole
Mavic X223 Disc
Spoke nipples typeBrass Nipples
Spoke wheel 14/15ga. Double-butted
Stainless Steel

Frame and Body Specs

Frame materialsAN-6 Aluminum
Frame typeTIG-welded
Handlebar constructionTomac Aluminum
Handlebar extenderOptional
Handlebar stem detailsTomac Aluminum
Headset size1 1/8 (inches) Threadless FSA Orbit MX

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG53
Bottom bracket shell widthNot Available
Bottom bracket typeFSA
Crankset parts and sizes 22/32/44 Teeth
FSA
Gear shift leversShimano Deore
Rear gear set 11 - 34 Teeth
9-speed

Tomac Revolver Comp Fork System Data

Derailleur (Front) Bottom Bracket Mount
Shimano Deore LX
Derailleur (Rear)Shimano Deore XT SGS
Fork material Single Crown
Aluminum and magnesium
Fork type 80 (millimeters) Travel
Answer Manitou Skareb Elite

Other Specs of Tomac Revolver Comp

Component group setsMountain Mix
Pedals detailsNot Available
Rear shock absorberFox Float L
Saddle seat Ti Rails
Tomac Leather
Seat post extensionTomac Aluminum


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....