Trek EPIC EXPERT CARBON 29ER 2011 VS Merlin CRITICAL PATH 1998 specs comparison

Trek Epic Expert Carbon 29er 2011 comparison online with competitors

Trek Epic Expert Carbon 29er

General Infos
Model Epic Expert Carbon 29er
Manufacturer Trek
Year of production 2011
Current price Check price Here ==>   
Color choice -Red and White
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire Rear: 29 X 1.95 (inches) S-Works Renegade
Front: 29 X 2.0 (inches) S-Works The Captain
Bike rear tireNot Available
Bike wheel size29 (inches) Wheels
Brakeset type Avid Elixir CR SL Levers
Avid Elixir CR SL Brakes
Hubs for disc brakesSpecialized Hi Lo Disc
Rims manufacturer 32-hole
DT Swiss X450SL
Spoke nipples typeNot Available
Spoke wheel 15/18ga. Double-butted
DT Swiss Competition Stainless Steel

Frame and Body Specs

Frame materialsFACT 9m Carbon
Frame typeBonded and monocoque
Handlebar constructionSpecialized XC Flat 31.8 (millimeters)
Handlebar extenderOptional
Handlebar stem detailsSpecialized XC
Headset size1 1/8 (inches) - 1 1/2 (inches) Campy Spec Integrated Sealed Cartridge Bearing

Gearing Specifications

Bicycle chainKMC X10
Bottom bracket shell widthNot Available
Bottom bracket typeSRAM PF-30
Crankset parts and sizes 24/38 Teeth
SRAM Carbon S-2200
Gear shift leversSRAM X.9
Rear gear set 11 - 36 Teeth
10-speed

Trek Epic Expert Carbon 29er Fork System Data

Derailleur (Front) S3 Direct Mount
SRAM X.7
Derailleur (Rear)SRAM X.0
Fork materialSingle
Fork type 100 (millimeters) Travel
RockShox Reba 29

Other Specs of Trek Epic Expert Carbon 29er

Component group setsSRAM Mix
Pedals detailsResin Test Ride Pedals
Rear shock absorber 100 (millimeters) Travel
Fox Mini-Brain
Saddle seatSpecialized BG Phenom
Seat post extension 30.9 (millimeters) Diameter
Alloy Single Bolt Setback


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....