Trek HIFI PLUS 2011 VS Merlin CRITICAL PATH 1998 specs comparison
Trek HiFi Plus
General InfosModel | HiFi Plus |
Manufacturer | Trek |
Year of production | 2011 |
Current price | Check price Here ==> |
Color choice | -Matte Dark Gray and Titanite Black |
Sizes | - 15.5 (inches)- 17.5 (inches)- 19 (inches)- 21 (inches)- 23 (inches) |
Sizes | - 15.5 (inches)- 17.5 (inches)- 19 (inches)- 21 (inches)- 23 (inches) |
Wheels And Breaking System
Bike front tire | 29 X 2.1 (inches) Bontrager 29-2 |
Bike rear tire | Not Available |
Bike wheel size | 29 (inches) Wheels |
Brakeset type | Avid Juicy 3 |
Hubs for disc brakes | Shimano Alloy M525 |
Rims manufacturer | 32-holeBontrager SSR |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | Alloy |
Frame type | TIG-welded |
Handlebar construction | Bontrager Race Big Sweep |
Handlebar extender | Optional |
Handlebar stem details | Bontrager |
Headset size | FSA 57E1 |
Gearing Specifications
Bicycle chain | Not Available |
Bottom bracket shell width | Not Available |
Bottom bracket type | Not Available |
Crankset parts and sizes | 22/32/44 TeethSRAM S1000 |
Gear shift levers | SRAM X.7 |
Rear gear set | 12 - 36 Teeth10-speed |
Trek HiFi Plus Fork System Data
Derailleur (Front) | Shimano SLX |
Derailleur (Rear) | SRAM X.7 |
Fork material | Single |
Fork type | 100 (millimeters) TravelRockShox Reba RL 29 |
Other Specs of Trek HiFi Plus
Component group sets | SRAM X.7 |
Pedals details | Optional |
Rear shock absorber | 110 (millimeters) TravelFox Float RP2 |
Saddle seat | Bontrager Evoke 1 |
Seat post extension | 31.6 (millimeters) DiameterBontrager SSR |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Trek provided us with the latest version of its HiFi Plus bike manual
- Find All parts, tires and accessories of Trek HiFi Plus Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here