Trek SESSION 10 2008 VS Merlin CRITICAL PATH 1998 specs comparison

Trek Session 10 2008 comparison online with competitors

Trek Session 10

General Infos
Model Session 10
Manufacturer Trek
Year of production 2008
Current price Check price Here ==>   
Color choice -White
Sizes - 15.5 (inches)
- 17.5 (inches)
- 19.5 (inches)
Sizes - 15.5 (inches)
- 17.5 (inches)
- 19.5 (inches)

Wheels And Breaking System

Bike front tire26 X 2.60 (inches) Bontrager Big Earl
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Juicy 7 Levers
Avid Juicy 7 With 203 (millimeters) Rotor Brakes
Hubs for disc brakes Rear: Bontrager King Earl 150 (millimeters)
Front: Bontrager King Earl
Rims manufacturerBontrager King Earl
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsAlpha Red Aluminum
Frame typeTIG-welded
Handlebar constructionBontrager King Earl
Handlebar extenderOptional
Handlebar stem detailsManitou IS-2 Integrated
Headset sizeCane Creek Double XC

Gearing Specifications

Bicycle chainNot Available
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 38 Teeth
Bontrager King Earl
Gear shift leversSRAM X.0 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Trek Session 10 Fork System Data

Derailleur (Front)E-Thirteen SRS
Derailleur (Rear)SRAM X.0
Fork material Single Crown
Aluminum and magnesium
Fork type 203 (millimeters) Travel
Manitou Travis Triple Intrinsic

Other Specs of Trek Session 10

Component group setsDownhill Mix
Pedals detailsBontrager King Earl Platform
Rear shock absorber 254 (millimeters) Travel
Manitou Revox ISX
Saddle seatBontrager Big Earl
Seat post extensionBontrager King Earl


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....