Trek STP 400 2000 VS Merlin CRITICAL PATH 1998 specs comparison

Trek STP 400 2000 comparison online with competitors

Trek STP 400

General Infos
Model STP 400
Manufacturer Trek
Year of production 2000
Current price Check price Here ==>   
Color choice -Smoke Nude
Sizes - Large
- medium
- xlarge
Sizes - Large
- medium
- xlarge

Wheels And Breaking System

Bike front tire Rear: 26 X 1.80 (inches) Bontrager Super-X
Front: 26 X 1.90 (inches) Bontrager Super-X
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Avid SD-Mag Brakes
Hubs for disc brakesRolf Propel
Rims manufacturer 24-hole and 28-hole
Rear: Rolf Propel Assymetric
Front: Rolf Propel
Spoke nipples typeNot Available
Spoke wheel 2.0 (millimeters) Double-butted
DT Stainless Steel

Frame and Body Specs

Frame materialsOCLV Carbon Fiber
Frame typeBonded
Handlebar constructionICON Sterling
Handlebar extenderIcon Sterling
Handlebar stem detailsICON Sterling
Headset sizeWTB Momentum Comp ST

Gearing Specifications

Bicycle chain1/2 X 3/32 (inches)
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M952
Gear shift leversShimano XTR RapidFire SL
Rear gear set 12 - 34 Teeth
9-speed

Trek STP 400 Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 2.5 (inches) Travel
Rock Shox SID Race

Other Specs of Trek STP 400

Component group setsMountain Mix
Pedals detailsTime ATAC Carbon
Rear shock absorberRock Shox SID Adjust
Saddle seatSelle Italia Flite Gel
Seat post extensionThomson Elite


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....