A PHP Error was encountered

Severity: Warning

Message: fopen(/opt/alt/php73/var/lib/php/session/ci_session1b670c72f7a27e2dc96b2059baa81ee608debf7a): failed to open stream: Disk quota exceeded

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /opt/alt/php73/var/lib/php/session)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /home7/manyoff1/yobicycle_public_html/index.php
Line: 315
Function: require_once

Trek Y 22 1997 VS Merlin CRITICAL PATH 1998 specs and price comparison online

Trek Y 22 1997 VS Merlin CRITICAL PATH 1998 specs comparison

Trek Y 22 1997 comparison online with competitors

Trek Y 22

General Infos
Model Y 22
Manufacturer Trek
Year of production 1997
Current price Check price Here ==>   
Color choice -Cream
Sizes - Large
- medium
- small
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Panaracer Duster II Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore LX Levers
Shimano Deore LX V-Brake Brakes
Hubs for disc brakes Rear: Shimano Deore XT
Front: System 3 Suspension
Rims manufacturer 32-hole
Matrix Swami
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double Butted
DT Competition Stainless Steel

Frame and Body Specs

Frame materialsOCLV Carbon Fiber and 6061 T6 Aluminum Swingarm
Frame typeMonocoque
Handlebar constructionBontrager Race
Handlebar extenderBontrager Race
Handlebar stem detailsBontrager Aluminum
Headset size1 1/8 (inches) Threadless Tange-Seiki DX-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG70
Bottom bracket shell width73 (millimeters) English
Bottom bracket type 113 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore LX
Gear shift leversGrip Shift ESP 900
Rear gear set 11 - 30 Teeth
8-speed

Trek Y 22 Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano Deore LX Top-swing
Derailleur (Rear)Grip Shift ESP 9.0
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Judy XC

Other Specs of Trek Y 22

Component group setsGrip Shift and Shimano Deore LX
Pedals detailsShimano PD-M535 SPD Clipless
Rear shock absorber 1.6 (inches) Travel
Fox Alps-5
Saddle seatSelle San Marco Tecno Dynamica
Seat post extension 27.2 (millimeters) Diameter
System 2


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....