Trek Y 5 1997 VS Merlin CRITICAL PATH 1998 specs comparison
Trek Y 5
General InfosModel | Y 5 |
Manufacturer | Trek |
Year of production | 1997 |
Current price | Check price Here ==> |
Color choice |
-Polished |
Sizes |
- Large - medium - small |
Sizes |
- Large - medium - small |
Wheels And Breaking System
Bike front tire | Rear: 26 X 1.95 (inches) Tioga Psycho TT Kevlar Front: 26 X 1.95 (inches) Tioga Psycho K Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano Deore LX Levers Shimano Deore LX V-Brake Brakes |
Hubs for disc brakes | Rear: Shimano STX-RC Front: System 2 Suspension |
Rims manufacturer | 32-hole Matrix Swami |
Spoke nipples type | Brass Nipples |
Spoke wheel | 2.0 (millimeters) Straight Gauge DT Stainless Steel |
Frame and Body Specs
Frame materials | 6061 T6 Aluminum |
Frame type | TIG-welded |
Handlebar construction | System 1 |
Handlebar extender | Bontrager Race |
Handlebar stem details | Bontrager Aluminum |
Headset size | 1 1/8 (inches) Threadless Tange-Seiki DX-2 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG70 |
Bottom bracket shell width | 73 (millimeters) English |
Bottom bracket type | 113 (millimeters) Spindle Shimano BB-UN51 |
Crankset parts and sizes | 22/32/42 Teeth Shimano STX-RC |
Gear shift levers | Shimano Deore LX RapidFire SL |
Rear gear set | 11 - 30 Teeth 8-speed |
Trek Y 5 Fork System Data
Derailleur (Front) | Top-pull and clamp-on 35.0 (millimeters) Shimano Deore LX Top-swing |
Derailleur (Rear) | Shimano Deore LX SGS |
Fork material | Triple-clamp Crown Magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Trek Y 5
Component group sets | Shimano Deore LX and STX-RC |
Pedals details | System 1 With Clips & Straps |
Rear shock absorber | 1.75 (inches) Travel Fox Vanilla |
Saddle seat | Bontrager Plus 10 |
Seat post extension | 27.2 (millimeters) Diameter System 1 |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Trek provided us with the latest version of its Y 5 bike manual
- Find All parts, tires and accessories of Trek Y 5 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here