Ventana EL HABANERO (02) 1997 VS Merlin CRITICAL PATH 1998 specs comparison

Ventana El Habanero (02) 1997 comparison online with competitors

Ventana El Habanero (02)

General Infos
Model El Habanero (02)
Manufacturer Ventana
Year of production 1997
Current price Check price Here ==>   
Color choice -Blue with ball burnished rear triangle
Sizes - 14 (inches)
- 16 (inches)
- 18 (inches)
- 20 (inches)
- 22 (inches)
Sizes - 14 (inches)
- 16 (inches)
- 18 (inches)
- 20 (inches)
- 22 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) IRC PiranhaPro
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore LX Levers
Shimano Deore LX V-Brake Rear Brakes
Hubs for disc brakes Rear: Shimano R080
Silent Clutch
Front: Shimano Deore LX
Rims manufacturer 32-hole
Mavic 221
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double Butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros
Headset size1 1/8 (inches) Threadless Dia-Compe Kontak Aheadset DL-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG70
Bottom bracket shell width73 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-UN52
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore LX
Gear shift leversShimano Deore LX RapidFire SL
Rear gear set 11 - 28 Teeth
8-speed

Ventana El Habanero (02) Fork System Data

Derailleur (Front) Top-pull and bottom Bracket Mount
Shimano Deore LX
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Judy XC

Other Specs of Ventana El Habanero (02)

Component group setsShimano Deore LX
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Fox Vanilla
Saddle seatBontrager With Hollow Chromoly Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....