VooDoo CANZO AL XTR/ESP/JETT XC 1999 VS Merlin CRITICAL PATH 1998 specs comparison

VooDoo Canzo AL XTR/ESP/Jett XC 1999 comparison online with competitors

VooDoo Canzo AL XTR/ESP/Jett XC

General Infos
Model Canzo AL XTR/ESP/Jett XC
Manufacturer VooDoo
Year of production 1999
Current price Check price Here ==>   
Color choice - Shaka Yellow
-Polished with Black rear triangle
Sizes - 14 (inches)
- 16 (inches)
- 17 (inches)
- 18.5 (inches)
- 19.5 (inches)
- 21 (inches)
Sizes - 14 (inches)
- 16 (inches)
- 17 (inches)
- 18.5 (inches)
- 19.5 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor 44/50 Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic X517
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materialsEaston ProGram Elite Double-butted
Frame typeTIG-welded
Handlebar constructionTitec PG Titanium
Handlebar extenderOptional
Handlebar stem detailsTitec AL-PG
Headset size1 1/8 (inches) Threadless WTB Grease Guard

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-7700
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110 (millimeters) Spindle
Shimano BB-M952
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M952
Gear shift leversSRAM ESP 9.0
Rear gear set 11 - 32 Teeth
9-speed

VooDoo Canzo AL XTR/ESP/Jett XC Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano XTR Top-swing
Derailleur (Rear)SRAM ESP 9.0
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 3.0 (inches) Travel
Rock Shox Jett XC

Other Specs of VooDoo Canzo AL XTR/ESP/Jett XC

Component group setsShimano XTR
Pedals detailsShimano PD-M747 SPD
Rear shock absorber 4.0 (inches) Travel
Rock Shox Super Deluxe
Saddle seatKoski Titanium and vinyl and kevlar
Seat post extension 27.2 (millimeters) Diameter
Titec Aluminum


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....