VooDoo CANZO TI/AL (02) 1996 VS Merlin CRITICAL PATH 1998 specs comparison
VooDoo Canzo Ti/AL (02)
General InfosModel | Canzo Ti/AL (02) |
Manufacturer | VooDoo |
Year of production | 1996 |
Current price | Check price Here ==> |
Color choice |
-Brushed with red rear triangle |
Sizes |
- 16 (inches) - 17.25 (inches) - 18.5 (inches) - 19.5 (inches) - 20.5 (inches) |
Sizes |
- 16 (inches) - 17.25 (inches) - 18.5 (inches) - 19.5 (inches) - 20.5 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.10 (inches) Ritchey Omega Bite HD Kevlar Front: 26 X 2.10 (inches) Ritchey Alphabite HD Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Levers WTB Speed Master Cantilever Brakes |
Hubs for disc brakes | Not Available |
Rims manufacturer | 32-hole WTB Powerbeam |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 1.8 (millimeters) Double Butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium With Easton ProGram Elite Butted Rear |
Frame type | Welded Titanium and welded Aluminum |
Handlebar construction | Titec 118g Titanium |
Handlebar extender | Optional |
Handlebar stem details | Titec T-Slot Chromoly |
Headset size | 1 1/8 (inches) Threadless King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 107 (millimeters) Spindle Syncros Hardcore Ti |
Crankset parts and sizes | 22/32/44 Teeth Cook Bros. E |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 12 - 32 Teeth 8-speed |
VooDoo Canzo Ti/AL (02) Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 31.8 (millimeters) Shimano XTR Top-swing |
Derailleur (Rear) | Paul Components Powerglide |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Judy SL |
Other Specs of VooDoo Canzo Ti/AL (02)
Component group sets | Not Available |
Pedals details | Shimano PD-M747 SPD |
Rear shock absorber | 3.8 (inches) Travel Fox Alps-4R |
Saddle seat | Titanium Rails WTB SST |
Seat post extension | 26.8 (millimeters) Diameter Titec C191 Carbon Fiber |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, VooDoo provided us with the latest version of its Canzo Ti/AL (02) bike manual
- Find All parts, tires and accessories of VooDoo Canzo Ti/AL (02) Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here