VooDoo MARASA SPORT (02) 2000 VS Merlin CRITICAL PATH 1998 specs comparison

VooDoo Marasa Sport (02) 2000 comparison online with competitors

VooDoo Marasa Sport (02)

General Infos
Model Marasa Sport (02)
Manufacturer VooDoo
Year of production 2000
Current price Check price Here ==>   
Color choice -Not found
Sizes - Not available
Sizes - Not available

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) WTB EnduroRaptor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid SD-1.9 L Levers
Avid Arch Rival 40 Brakes
Hubs for disc brakesShimano Deore LX
Rims manufacturer 32-hole
Mavic X221
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Straight Gauge
WTB Stainless Steel

Frame and Body Specs

Frame materials Double-butted
7005 Aluminum
Frame typeTIG-welded
Handlebar constructionTitec Enduro HF
Handlebar extenderOptional
Handlebar stem detailsTitec Big AL
Headset size1 1/8 (inches) Threadless Ritchey Scuzzy Logic

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG72
Bottom bracket shell widthNot Available
Bottom bracket typeShimano BB-ES70
Crankset parts and sizes 22/32/44 Teeth
Shimano Deore LX
Gear shift leversShimano Deore LX RapidFire SL
Rear gear set 11 - 32 Teeth
9-speed

VooDoo Marasa Sport (02) Fork System Data

Derailleur (Front)Shimano Deore LX Top-swing
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork type 3.15 (inches) Travel
Answer Manitou MARS

Other Specs of VooDoo Marasa Sport (02)

Component group setsShimano Deore LX
Pedals detailsRitchey Logic Comp V.2
Rear shock absorber 4.0 (inches) Travel
Rock Shox Deluxe Adjust
Saddle seatWTB SST
Seat post extensionTitec Aluminum


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....