Yeti 575 CARBON XTR 2008 VS Merlin CRITICAL PATH 1998 specs comparison

Yeti 575 Carbon XTR 2008 comparison online with competitors

Yeti 575 Carbon XTR

General Infos
Model 575 Carbon XTR
Manufacturer Yeti
Year of production 2008
Current price Check price Here ==>   
Color choice - Orange
- Pewter
- Turquoise
-Anodized Black
Sizes - Xsmall
- small
- medium
- large
- xlarge
Sizes - Xsmall
- small
- medium
- large
- xlarge

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Maxxis Crossmark
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Hydraulic Levers
Shimano XTR Hydraulic Disc Brakes
Hubs for disc brakesShimano XTR Centerlock Tubeless
Rims manufacturerShimano XTR Centerlock Tubeless
Spoke nipples typeNot Available
Spoke wheelNot Available

Frame and Body Specs

Frame materialsYeti Pure Aluminum and carbon Swingarm
Frame typeTIG-welded and bonded
Handlebar constructionEaston Monkey Lite
Handlebar extenderOptional
Handlebar stem detailsThomson X-4
Headset size1 1/8 (inches) Chris King

Gearing Specifications

Bicycle chainShimano XTR
Bottom bracket shell widthNot Available
Bottom bracket typeShimano Hollowtech II
Crankset parts and sizes 22/32/44 Teeth
Shimano XTR
Gear shift leversShimano XTR Trigger
Rear gear set 11 - 34 Teeth
9-speed

Yeti 575 Carbon XTR Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)Shimano XTR Shadow
Fork material Single Crown
Aluminum and magnesium
Fork type 140 (millimeters) Travel
Fox Float 140 RLC

Other Specs of Yeti 575 Carbon XTR

Component group setsShimano XTR
Pedals detailsNot Available
Rear shock absorber 5.75 (inches) Travel
Fox RP23
Saddle seatYeti and SDG TI Fly C
Seat post extension 30.9 (millimeters) Diameter
Thomson Elite


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....