Cannondale SCALPEL 2 2009 VS Merlin CRITICAL PATH 1998 specs comparison

Cannondale Scalpel 2 2009 comparison online with competitors

Cannondale Scalpel 2

General Infos
Model Scalpel 2
Manufacturer Cannondale
Year of production 2009
Current price Check price Here ==>   
Color choice -Team Blue
Sizes - Small
- Medium
- Large
- Extra large
Sizes - Small
- Medium
- Large
- Extra large

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) Continental Race King
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Elixir CR Carbon Levers
Avid Elixir CR Carbon With 160 (millimeters) Rotor Brakes
Hubs for disc brakes Rear: DT Swiss 240S
Front: Cannondale Lefty SL
Rims manufacturer 24-hole
DT Swiss XCR 1.4
Spoke nipples typeNot Available
Spoke wheelDT Swiss Aerospeed

Frame and Body Specs

Frame materialsCarbon Fiber
Frame typeMonocoque
Handlebar constructionTruVativ Stylo Team
Handlebar extenderOptional
Handlebar stem detailsCannondale XC3 Si
Headset sizeCannondale HeadShok Si

Gearing Specifications

Bicycle chainShimano Nine Speed
Bottom bracket shell widthNot Available
Bottom bracket typeFSA BB30
Crankset parts and sizes 22/32/44 Teeth
FSA Afterburner BB30
Gear shift leversSRAM X.9 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Cannondale Scalpel 2 Fork System Data

Derailleur (Front)Shimano XT
Derailleur (Rear)SRAM X.9
Fork materialCarbon and aluminum
Fork type 110 (millimeters) Travel
Cannondale Lefty Speed Carbon SL With DLR

Other Specs of Cannondale Scalpel 2

Component group setsSRAM X.9/mix
Pedals detailsTest Ride
Rear shock absorber 100 (millimeters) Travel
Fox Float RP23
Saddle seatFi'zi:k Aliante Delta XM With Mg Rails
Seat post extension 27.2 (millimeters) Diameter
TruVativ Team Carbon


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....