Haro EXTREME EX1 2000 VS Merlin CRITICAL PATH 1998 specs comparison
![Haro Extreme EX1 2000 comparison online with competitors](https://yobicycle.com/images/models/Haro-Extreme-EX1-2000-specs.jpg)
Haro Extreme EX1
General InfosModel | Extreme EX1 |
Manufacturer | Haro |
Year of production | 2000 |
Current price | Check price Here ==> |
Color choice |
- Ruby Red -Pearl Black |
Sizes |
- 15.5 (inches) - 17.5 (inches) - 19.5 (inches) |
Sizes |
- 15.5 (inches) - 17.5 (inches) - 19.5 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Dia-Tech MX-2 Levers Dia-Tech Spiral Stop Disc Front and Shimano Deore V-Brake Rear Brakes |
Hubs for disc brakes | Rear: Haro RR Alloy Cassette Front: Haro FDAlloy QR |
Rims manufacturer | 32-hole WTB SpeedMaster |
Spoke nipples type | Brass Nipples |
Spoke wheel | 2.0 (millimeters) Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | 7005 Aluminum With Replaceable Derailleur Hanger |
Frame type | TIG-welded |
Handlebar construction | 1.5 (inches) Rise Aluminum |
Handlebar extender | Not Available |
Handlebar stem details | Alloy 4 Bolt |
Headset size | 1 1/8 (inches) Threadless Aheadset SE-1 |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-HG72 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 107 (millimeters) Spindle Tien Hsin BB-7700 |
Crankset parts and sizes | 22/32/42 Teeth SR MD350 |
Gear shift levers | Shimano Deore Rapidfire Plus |
Rear gear set | 11 - 32 Teeth 9-speed |
Haro Extreme EX1 Fork System Data
Derailleur (Front) | Top-pull and bottom Bracket Mount Shimano Deore LX Top-swing |
Derailleur (Rear) | Shimano Deore SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | 3.0 (inches) Travel Answer Manitou Magnum |
Other Specs of Haro Extreme EX1
Component group sets | Shimano Deore |
Pedals details | Steel Cage With Clips & Straps |
Rear shock absorber | 4.25 (inches) Travel Rock Shox Deluxe |
Saddle seat | Steel Rails WTB SSTX |
Seat post extension | 31.6 (millimeters) Diameter Haro Micro-adjust |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Haro provided us with the latest version of its Extreme EX1 bike manual
- Find All parts, tires and accessories of Haro Extreme EX1 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here