Kona COILAIR SUPREME 2007 VS Merlin CRITICAL PATH 1998 specs comparison

Kona Coilair Supreme 2007 comparison online with competitors

Kona Coilair Supreme

General Infos
Model Coilair Supreme
Manufacturer Kona
Year of production 2007
Current price Check price Here ==>   
Color choice -Orange Matt and Black
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 18 (inches)
- 19 (inches)
- 20 (inches)

Wheels And Breaking System

Bike front tire26 X 2.40 (inches) Maxxis Advantage
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Saint Hydraulic Disc Levers
Shimano Saint Hydraulic Disc Brakes
Hubs for disc brakes Rear: Shimano FH-M756 Disc
Front: KK KDH3 20 (millimeters)
Rims manufacturerSun Rims Single Track
Spoke nipples typeNot Available
Spoke wheel 14ga.
DT Swiss Stainless Steel

Frame and Body Specs

Frame materialsKona Clump 7005 Aluminum
Frame typeTIG-welded
Handlebar constructionRace Face Evolve DH OS Riser
Handlebar extenderOptional
Handlebar stem detailsRace Face Evolve AM OS
Headset size1 1/8 (inches) Threadless FSA PIG

Gearing Specifications

Bicycle chainShimano CN-HG93
Bottom bracket shell widthNot Available
Bottom bracket typeRace Face Atlas AM X-Type
Crankset parts and sizes 36/24 Teeth
Race Face Atlas AM X-Type
Gear shift leversShimano Deore XT
Rear gear set 11 - 34 Teeth
9-speed

Kona Coilair Supreme Fork System Data

Derailleur (Front)Shimano Deore XT
Derailleur (Rear)Shimano Deore XT
Fork materialSingle
Fork type 160 (millimeters) Travel
Fox 36 Float RC2

Other Specs of Kona Coilair Supreme

Component group setsShimano Deore XT
Pedals detailsKona Jackshit Primo
Rear shock absorber 6 (inches) Travel
Fox DHX Coil 5.0
Saddle seatWTB Pure V Race FR
Seat post extensionRace Face Evolve DH


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....