Merlin CRITICAL PATH 1998 VS Dean DUKE XC (07) 1997 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Dean Duke XC (07) 1997 comparison online with competitors

Dean Duke XC (07)

General Infos
Model Duke XC (07)
Manufacturer Dean
Year of production 1997
Current price Check price Here ==>   
Color choice -Brushed
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano Deore LX Levers
Shimano Deore LX V-Brake Brakes
Hubs for disc brakes Rear: Shimano Deore LX
Front: Shimano Deore LX Suspension
Rims manufacturer 32-hole
Mavic 238
Spoke nipples typeBrass Nipples
Spoke wheel 2.0 (millimeters) Double Butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionDean Aluminum
Handlebar extenderOptional
Handlebar stem detailsDean Aluminum
Headset size1 1/8 (inches) Threadless Dia-Compe Aheadset

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG70
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 107 (millimeters) Spindle
Shimano BB-UN72
Crankset parts and sizes 22/32/42 Teeth
Shimano Deore LX
Gear shift leversGrip Shift SRT-800 X-Ray
Rear gear set 11 - 28 Teeth
8-speed

Dean Duke XC (07) Fork System Data

Derailleur (Front) Top-pull and clamp-on 35.0 (millimeters)
Shimano Deore XT Top-swing
Derailleur (Rear)Shimano Deore XT SGS
Fork material Triple-clamp Crown
Magnesium
Fork typeRock Shox Judy SL

Other Specs of Dean Duke XC (07)

Component group setsShimano Deore XT and LX
Pedals detailsOptional
Rear shock absorber 1.25 (inches) Travel
Stratos Strata
Saddle seat Titanium Rails
SDG 2000 Kevlar
Seat post extension 27.2 (millimeters) Diameter
Dean Aluminum


Useful links and guides ....