Merlin CRITICAL PATH 1998 VS Dean SPUTNIK CTI 2002 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Dean Sputnik CTi 2002 comparison online with competitors

Dean Sputnik CTi

General Infos
Model Sputnik CTi
Manufacturer Dean
Year of production 2002
Current price Check price Here ==>   
Color choice -Titanium and Carbon
Sizes - Large
- small/medium
- xlarge

Wheels And Breaking System

Bike front tireOptional
Bike rear tireNot Available
Bike wheel sizeOptional Wheels
Brakeset type Shimano XTR RapidFire SL Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesBontrager ATB Pro
Rims manufacturer 24-hole and 28-hole
Bontrager Race Lite Tubeless
Spoke nipples typeAluminum Nipples
Spoke wheel 14/17ga. Double-butted
Stainless Steel

Frame and Body Specs

Frame materialsCarbon Fiber Composite and 3Al and 2.5V Titanium
Frame typeFiber-fusion and TIG-welded
Handlebar constructionDEAN Titanium
Handlebar extenderOptional
Handlebar stem detailsDEAN Forged Aluminum
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-7700
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 116 (millimeters) Spindle
Shimano BB-M952
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR
Gear shift leversShimano XTR RapidFire SL
Rear gear set Optional Of Gearing
9-speed

Dean Sputnik CTi Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Single Triple-clamp Crown
Aluminum and carbon Fiber Composite
Fork typeRock Shox Sid Carbon

Other Specs of Dean Sputnik CTi

Component group setsShimano XTR
Pedals detailsNot Available
Rear shock absorber 1.15 (inches) Travel
Stratos Pro
Saddle seatFi'zi:k: Nisene Ti
Seat post extension 27.2 (millimeters) Diameter
DEAN Titanium Post


Useful links and guides ....