Merlin CRITICAL PATH 1998 VS Fuji DISCOVERY 2 2006 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Fuji Discovery 2 2006 comparison online with competitors

Fuji Discovery 2

General Infos
Model Discovery 2
Manufacturer Fuji
Year of production 2006
Current price Check price Here ==>   
Color choice -Fuji Red
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
- 21 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) Kenda
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Unavailable Front and included In Shifter Rear Levers
ProMax Forged Linear-pull Brakes
Hubs for disc brakesFormula ATB Oversized
Rims manufacturer 36-hole
VP-20 Aluminum
Spoke nipples typeNot Available
Spoke wheel 14ga. Straight Gauge
Stainless Steel

Frame and Body Specs

Frame materialsFuji Altair 1
Frame typeTIG-welded
Handlebar constructionFuji AL
Handlebar extenderNot Available
Handlebar stem detailsFuji Forged Aluminum
Headset size1 1/8 (inches) Threadless Ritchey

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC Z50
Bottom bracket shell widthNot Available
Bottom bracket typeLoose Ball
Crankset parts and sizes 28/38/48 Teeth
Suntour XCC-100
Gear shift leversShimano Altus EZ-Fire
Rear gear set 14 - 34 Teeth
8-speed

Fuji Discovery 2 Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Suntour TP05
Derailleur (Rear)Shimano Altus Megarange
Fork material Single Crown
Aluminum and steel
Fork type 50 (millimeters) Travel
SR Suntour M-2000

Other Specs of Fuji Discovery 2

Component group setsMountain Mix
Pedals detailsWellgo ATB
Rear shock absorber 80 (millimeters) Travel
Tough Shock SD
Saddle seatFuji DuraFlex Sport
Seat post extension 27.2 (millimeters) Diameter
Fuji Alloy Micro-Adjust


Useful links and guides ....