Merlin CRITICAL PATH 1998 VS Jamis DAKAR XCR RACE 2010 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Jamis Dakar XCR Race
General InfosModel | Dakar XCR Race |
Manufacturer | Jamis |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Copper and Pearl White |
Sizes |
- 13 (inches) - 15 (inches) - 17 (inches) - 19 (inches) - 21 (inches) |
Wheels And Breaking System
Bike front tire | Rear: 26 X 1.9 (inches) Geax Mezcal Front: 26 X 2.1 (inches) Geax Mezcal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano Deore XT Levers Shimano Deore XT With 160 (millimeters) Rotor Brakes |
Hubs for disc brakes | Shimano Deore M595 Center Lock Disc |
Rims manufacturer | 32-hole Mavic XM317 |
Spoke nipples type | Nickel-Plated Brass |
Spoke wheel | DT Swiss Champion Stainless Steel |
Frame and Body Specs
Frame materials | Kinesium Alloy Front Triangle With STW Optimized 7005 Seat And Chainstays |
Frame type | TIG-welded |
Handlebar construction | Ritchey MTN Comp Riser OS |
Handlebar extender | Optional |
Handlebar stem details | Ritchey Comp V2 OS |
Headset size | 1 1/8 (inches) Threadless Ritchey Pro Logic Press Fit |
Gearing Specifications
Bicycle chain | SRAM PC-971 With Power Link |
Bottom bracket shell width | Not Available |
Bottom bracket type | Shimano Deore XT Integrated |
Crankset parts and sizes | 44/32/22 Teeth Shimano Deore XT Hollowtech II |
Gear shift levers | Shimano Deore XT Rapid Fire Plus-SL |
Rear gear set | 11 - 34 Teeth 9-speed |
Jamis Dakar XCR Race Fork System Data
Derailleur (Front) | Top-pull and clamp-on 34.9 (millimeters) Shimano Deore XT |
Derailleur (Rear) | Shimano Deore XT Shadow |
Fork material | Single Crown |
Fork type | 100 (millimeters) Travel Fox 32 F100 RL |
Other Specs of Jamis Dakar XCR Race
Component group sets | Mountain Mix |
Pedals details | Not Available |
Rear shock absorber | 100 (millimeters) Travel Fox Float RP2 |
Saddle seat | WTB Silverado Team |
Seat post extension | 31.6 (millimeters) Diameter Ritchey Comp 2 Bolt |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Jamis Dakar XCR Race manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Jamis Dakar XCR Race Mountain bike here