Merlin CRITICAL PATH 1998 VS Jamis DIABLO 2.0 2007 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Jamis Diablo 2.0 2007 comparison online with competitors

Jamis Diablo 2.0

General Infos
Model Diablo 2.0
Manufacturer Jamis
Year of production 2007
Current price Check price Here ==>   
Color choice -Hemp
Sizes - 15.5GÇ¥
- 17.5GÇ¥
- 19.5GÇ¥

Wheels And Breaking System

Bike front tire Rear: 26 X 2.50 (inches) Maxxis High Roller UST
Front: 26 X 2.70 (inches) Maxxis High Roller UST
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Hayes El Camino Levers
Hayes El Camino Brakes
Hubs for disc brakes Rear: WTB LaserDisc SuperDuty 12 (millimeters) Thru--axle 150 (millimeters)
Front: WTB LaserDisc SuperDuty
Rims manufacturer 32-hole
Mavic EX823 UST
Spoke nipples typeNot Available
Spoke wheel 14ga. Straight Gauge
WTB Stainless Steel

Frame and Body Specs

Frame materials7005 Aluminum c
Frame typeTIG-welded
Handlebar constructionTruVativ Hussefelt
Handlebar extenderOptional
Handlebar stem detailsTruVativ Holzfeller
Headset size1 1/2 (inches) Threadless FSA Orbit Extreme Pro

Gearing Specifications

Bicycle chainShimano CN-HG93
Bottom bracket shell width83 (millimeters)
Bottom bracket typeTruVativ Howitzer Team
Crankset parts and sizes 24/36 Teeth
TruVativ Holzfeller
Gear shift leversSRAM X.9 Trigger
Rear gear set 11 - 34 Teeth
9-speed

Jamis Diablo 2.0 Fork System Data

Derailleur (Front) 31.8 (millimeters) Clamp
Shimano Saint
Derailleur (Rear)SRAM X.9
Fork material Single Crown
Aluminum and magnesium
Fork type 180 (millimeters)
Manitou Travis Single Intrinsic

Other Specs of Jamis Diablo 2.0

Component group setsSRAM X.9/mix
Pedals detailsCrank Brothers 5050xx
Rear shock absorber 175 (millimeters)
Manitou Swinger X4 Coil
Saddle seatWTB Power V Race DH
Seat post extensionTitec El Norte Pyro-Scooper


Useful links and guides ....