Merlin CRITICAL PATH 1998 VS K2 RAZORBACK 3.0 2001 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
![K2 Razorback 3.0 2001 comparison online with competitors](https://yobicycle.com/images/models/K2-Razorback-3.0-2001-specs.jpg)
K2 Razorback 3.0
General InfosModel | Razorback 3.0 |
Manufacturer | K2 |
Year of production | 2001 |
Current price | Check price Here ==> |
Color choice |
-Black and Blue two-toned |
Sizes |
- Large - medium - small - way big |
Wheels And Breaking System
Bike front tire | Rear: 26 X 2.20 (inches) WTB NanoRaptor DNA Front: 26 X 2.10 (inches) WTB NanoRaptor DNA |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Speed Dial 5 Levers Avid Single Digit 5 Brakes |
Hubs for disc brakes | WTB Speed C2 |
Rims manufacturer | 32-hole WTB SpeedMaster |
Spoke nipples type | Not Available |
Spoke wheel | 15/15g WTB Stainless Steel |
Frame and Body Specs
Frame materials | Easton Ultralite |
Frame type | TIG-welded |
Handlebar construction | Titec Enduro XC 6061 |
Handlebar extender | Optional |
Handlebar stem details | Aluminum Ahead Type |
Headset size | WTB Momentum Comp ST |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) KMC Z9000 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ Sealex Splined |
Crankset parts and sizes | TruVativ Stylo A2 |
Gear shift levers | Shimano Deore RapidFire SL |
Rear gear set | 11 - 32 Teeth 9-speed |
K2 Razorback 3.0 Fork System Data
Derailleur (Front) | Shimano LX |
Derailleur (Rear) | Shimano LX |
Fork material | Triple-clamp |
Fork type | 3.15 (inches) Travel Noleen Mega Air |
Other Specs of K2 Razorback 3.0
Component group sets | Mountain Mix |
Pedals details | Wellgo M9 Clipless |
Rear shock absorber | 3.0 (inches) Travel Razorback With Air Pull Shock |
Saddle seat | WTB SST.X3 |
Seat post extension | Titec X-Wing |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your K2 Razorback 3.0 manual book version yo know further about this bike
- Saddles, tires And mechanical parts for K2 Razorback 3.0 Mountain bike here