Merlin CRITICAL PATH 1998 VS Scott SPARK LTD 2010 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Scott Spark LTD
General InfosModel | Spark LTD |
Manufacturer | Scott |
Year of production | 2010 |
Current price | Check price Here ==> |
Color choice |
-Black |
Sizes |
- S - M - L - XL |
Wheels And Breaking System
Bike front tire | 26 X 2.25 (inches) Schwalbe Rocket Ron 127 TPI Kevlar Bead Evolution and Triple Compound |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Formula R1 Carbon Hydraulic Levers Formula R1 Disc With 180 (millimeters) Rotor Front and Formula R1 Disc With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | DT Swiss 240S |
Rims manufacturer | 28-hole DT Swiss XRC 330 Carbon |
Spoke nipples type | Not Available |
Spoke wheel | 2.0/1.5/2.0 Butted And Bladed DT Aerolite Stainless Steel |
Frame and Body Specs
Frame materials | Scott HMX NET Carbon Fiber |
Frame type | Monocoque |
Handlebar construction | Scott Pilot SL Integrated 600 (millimeters) |
Handlebar extender | Optional |
Handlebar stem details | Scott Pilot SL Integrated |
Headset size | 1 1/8 (inches) Semi-ntegrated Ritchey WCS Carbon 44/50 (millimeters) |
Gearing Specifications
Bicycle chain | SRAM PC 991 |
Bottom bracket shell width | 73 (millimeters) |
Bottom bracket type | Truvativ GXP Team |
Crankset parts and sizes | 22/32/44 Teeth TruVativ Noir 3.3 Team Carbon GXP |
Gear shift levers | SRAM X.0 Trigger |
Rear gear set | 11 - 32 Teeth 9-speed |
Scott Spark LTD Fork System Data
Derailleur (Front) | Clamp On 34.9 (millimeters) Shimano XTR M971 |
Derailleur (Rear) | SRAM X.0 Carbon Med. Cage |
Fork material | Single Crown Carbon Lowers |
Fork type | 100 (millimeters) Travel DT Swiss XRC 100 |
Other Specs of Scott Spark LTD
Component group sets | Mountain Mix |
Pedals details | Crank Brothers Egg Beater 4Ti |
Rear shock absorber | 110 (millimeters) Travel Scott Nude TC |
Saddle seat | Selle Italia SLR XP Kevlar and Carbon Rails |
Seat post extension | Integrated 38.2 (millimeters) Diameter Ritchey Stubby WCS |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Scott Spark LTD manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Scott Spark LTD Mountain bike here