Merlin CRITICAL PATH 1998 VS Specialized BIGHIT FSR II 2006 specs comparison
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |

Specialized Bighit FSR II
General InfosModel | Bighit FSR II |
Manufacturer | Specialized |
Year of production | 2006 |
Current price | Check price Here ==> |
Color choice |
-Not found |
Sizes |
- Not available |
Wheels And Breaking System
Bike front tire | 2 Ply Soft Compound 26 X 2.30 (inches) Specialized Chunder 60TPI |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy 5 Levers Hydraulic Disc Brake 8 (inches) Polygon Rotor Front and Avid Juicy 5 Hydraulic Disc With 8 (inches) Polygon Rotor Rear Brakes Avid Juicy 5 |
Hubs for disc brakes | 135 (millimeters) Spacing 20 (millimeters) Thru Axle Rear: Specialized Disc Bolt On Axle Front: Specialized Disc |
Rims manufacturer | 36-hole Sun Single Track SL-1 |
Spoke nipples type | Brass Nipples |
Spoke wheel | 14ga. Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | 6061 aluminum c |
Frame type | TIG-welded |
Handlebar construction | 31.8 (millimeters) 6 Degree Up 6061 Alloy 9 Degree Back Specialized Demo Rise Bar |
Handlebar extender | Optional |
Handlebar stem details | 31.8 Clamp 5 Degree X 40 (millimeters) Black Forged and CNC Stem Truvativ Hussefelt |
Headset size | OS Cro-Mo Cups 1 1/8 (inches) Threadless |
Gearing Specifications
Bicycle chain | SRAM PC-971 With Power Link |
Bottom bracket shell width | 73 (millimeters) English |
Bottom bracket type | Truvativ Howitzer XR |
Crankset parts and sizes | 170 (millimeters) With Truvativ Chain Guide 34 Teeth Truvativ Hussefelt |
Gear shift levers | 9-speed SRAM X-7 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Specialized Bighit FSR II Fork System Data
Derailleur (Front) | Not Available |
Derailleur (Rear) | Micro Cage SRAM X-9 |
Fork material | Single Crown Magnesium and aluminum and steel |
Fork type | Marzocchi Drop-Off Triple |
Other Specs of Specialized Bighit FSR II
Component group sets | SRAM Mix |
Pedals details | 3 (millimeters) Pressed Pins 9/16 (inches) Cr-Mo Axle Alloy Platform |
Rear shock absorber | 190 (millimeters) Travel 8.75x2.5 (inches) Fox Vanilla R Coil |
Saddle seat | 8 (millimeters) Steel Rails With X-Brace Specialized Freeride |
Seat post extension | Titec Scoper Telescopic |
Useful links and guides ....
- To know more about this exacte bike, Merlin provided us with the latest version of its Critical Path bike manual
- Find All parts, tires and accessories of Merlin Critical Path Mountain bike here
- Get your Specialized Bighit FSR II manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Specialized Bighit FSR II Mountain bike here