Merlin CRITICAL PATH 1998 VS Specialized MYKA FSR COMP 2008 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Specialized Myka FSR Comp 2008 comparison online with competitors

Specialized Myka FSR Comp

General Infos
Model Myka FSR Comp
Manufacturer Specialized
Year of production 2008
Current price Check price Here ==>   
Color choice -Brown
Sizes - Womens S
- womens M
- womens L

Wheels And Breaking System

Bike front tire Rear: 26x2.00 (inches) S-Works The Captain Sport
Front: 26 X 2.00 (inches) S-Works The Captain Sport
Bike rear tireNot Available
Bike wheel size Rear: 26x2.00 (inches) Wheels
Front: 26 (inches)
Brakeset type Hayes Stroker Ryde Levers
Hydraulic
Hydraulic
With 140 (millimeters) Rotor Rear Brakes
With 160 (millimeters) Rotor Front and Hayes Stroker Ryde
Hayes Stroker Ryde
Hubs for disc brakes Rear: Shimano M475
Front: Specialized Hi Lo Disc
Rims manufacturer 32-hole
Alex RHD 26
Spoke nipples typeAlloy Niples
Spoke wheel 15ga. Straight Gauge
DT Swiss Stainless Steel

Frame and Body Specs

Frame materialsM4 Aluminum
Frame typeTIG-welded
Handlebar construction 31.8
6 Up
620 (millimeters) Wide
8 Back
Specialized OS XC Low Rise
Handlebar extenderOptional
Handlebar stem details 31.8 Clamp
7 Degree Rise
Specialized 3d Forged Alloy
Headset size1 1/8 (inches) Threadless Threadless

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC X9
Bottom bracket shell widthNot Available
Bottom bracket typeShimano BB-ES25
Crankset parts and sizes 22/32/44 Teeth
Shimano M442-8
Gear shift leversShimano Deore M530
Rear gear set 11 - 34 Teeth
9-speed

Specialized Myka FSR Comp Fork System Data

Derailleur (Front) Clamp On 34.9 (millimeters)
Shimano M530
Derailleur (Rear)Shimano LX M581
Fork material Single Crown
Aluminum and magnesium
Fork type 100 (millimeters) Travel
RockShox Tora 302 SL

Other Specs of Specialized Myka FSR Comp

Component group setsMountain Mix
Pedals detailsSpecialized Aluminum
Rear shock absorber 100 (millimeters) Travel
X Fusion 02RC
Saddle seat 143 (millimeters) Width
Specialized Women's XC
Seat post extension 30.9 (millimeters) Diameter
Two-bolt Alloy Micro-Adjust


Useful links and guides ....