Merlin CRITICAL PATH 1998 VS Tomac SIX SHOOTER 2003 specs comparison

Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Tomac Six Shooter 2003 comparison online with competitors

Tomac Six Shooter

General Infos
Model Six Shooter
Manufacturer Tomac
Year of production 2003
Current price Check price Here ==>   
Color choice -Not found
Sizes - Large
- medium
- small

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) Kenda Kinetics
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Magura Louise FR Hydraulic Disc Levers
Magura Louise FR Hydraulic Disc Brakes
Hubs for disc brakesShimano Deore XT Disc
Rims manufacturer 32-hole
Mavic F219
Spoke nipples typeBrass Nipples
Spoke wheel 14/15ga. Double-butted
Stainless Steel

Frame and Body Specs

Frame materialsAN-6 Aluminum
Frame typeTIG-welded
Handlebar constructionTomac Aluminum
Handlebar extenderOptional
Handlebar stem detailsTomac Aluminum
Headset size1 1/8 (inches) Threadless Cane Creek C2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG73
Bottom bracket shell widthNot Available
Bottom bracket typeTruVativ GIGA Pipe SL
Crankset parts and sizes 22/32/44 Teeth
TruVativ Stylo Team
Gear shift leversShimano Deore XT RapidFire
Rear gear set 11 - 34 Teeth
9-speed

Tomac Six Shooter Fork System Data

Derailleur (Front) Bottom Bracket Mount
Shimano Deore XT
Derailleur (Rear)Shimano XTR
Fork material Single Crown
Aluminum and magnesium
Fork typeAnswer Manitou Sherman Flick

Other Specs of Tomac Six Shooter

Component group setsMountain Mix
Pedals detailsOptional
Rear shock absorberFox Float RL
Saddle seat Ti Rails
Tomac Leather
Seat post extensionTomac Aluminum


Useful links and guides ....