Norco SHORE THREE 2008 VS Merlin CRITICAL PATH 1998 specs comparison
Norco Shore Three
General InfosModel | Shore Three |
Manufacturer | Norco |
Year of production | 2008 |
Current price | Check price Here ==> |
Color choice |
-Anodized Brown |
Sizes |
- Small - medium - large |
Sizes |
- Small - medium - large |
Wheels And Breaking System
Bike front tire | 26 X 2.50 (inches) Kenda Nevagal |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Hayes Stroker Ryde Hydraulic Levers Hayes Stroker Ryde With V8 Rotor Brakes |
Hubs for disc brakes | Rear: Axiom 150x12 (millimeters) Front: Axiom 20 (millimeters) |
Rims manufacturer | 32-hole WTB Dual Duty |
Spoke nipples type | Not Available |
Spoke wheel | Not Available |
Frame and Body Specs
Frame materials | Aluminum |
Frame type | TIG-welded |
Handlebar construction | TruVativ Hussefelt |
Handlebar extender | Optional |
Handlebar stem details | FSA Gap OS |
Headset size | 1 1/2 (inches) FSA Big Fat Pig |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) KMC Z72 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ |
Crankset parts and sizes | 22/32 Teeth TruVativ Hussefelt |
Gear shift levers | Shimano Alivio |
Rear gear set | 11 - 30 Teeth 8-speed |
Norco Shore Three Fork System Data
Derailleur (Front) | 31.8 (millimeters) Clamp Shimano Alivio |
Derailleur (Rear) | Shimano Deore |
Fork material | Single |
Fork type | 180 (millimeters) Travel RockShox Domain |
Other Specs of Norco Shore Three
Component group sets | Mountain Mix |
Pedals details | Wellgo LU-A18 |
Rear shock absorber | 181 (millimeters) Travel Fox Vanilla R |
Saddle seat | Norco Shore |
Seat post extension | 30.9 (millimeters) Diameter Truvativ |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Norco provided us with the latest version of its Shore Three bike manual
- Find All parts, tires and accessories of Norco Shore Three Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here