Orange MR. XC XTR 2001 VS Merlin CRITICAL PATH 1998 specs comparison

Orange Mr. XC XTR 2001 comparison online with competitors

Orange Mr. XC XTR

General Infos
Model Mr. XC XTR
Manufacturer Orange
Year of production 2001
Current price Check price Here ==>   
Color choice - Team Orange
-Gloss White and Blue
Sizes - 14 (inches)
- 16 (inches)
- 18 (inches)
- 20 (inches)
Sizes - 14 (inches)
- 16 (inches)
- 18 (inches)
- 20 (inches)

Wheels And Breaking System

Bike front tire26 X 1.95 (inches) IRC Notos XC
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Avid Speed Dial Mag Levers
Avid Single Digit Magnesium Brakes
Hubs for disc brakesHope Sport
Rims manufacturer 32-hole
WTB SpeedMaster
Spoke nipples typeBrass Nipples
Spoke wheel Double-butted
Stainless Steel

Frame and Body Specs

Frame materials6061 T6 Aluminum
Frame typeTIG-welded
Handlebar constructionOrange Hot Rod
Handlebar extenderOrange 55 Ends
Handlebar stem detailsOrange Boner Fido
Headset size1 1/8 (inches) Threadless Ritchey Scuzzy Logic

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-HG92
Bottom bracket shell widthNot Available
Bottom bracket typeNot Available
Crankset parts and sizesShimano XTR
Gear shift leversShimano XTR RapidFire SL
Rear gear set9-speed

Orange Mr. XC XTR Fork System Data

Derailleur (Front)Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and carbon Fibe Composite
Fork type 3.15 (inches) Travel
Answer Manitou MARS CL

Other Specs of Orange Mr. XC XTR

Component group setsMountain Mix
Pedals detailsOrange Clipless
Rear shock absorber 5.0 (inches) Travel
Fox Float R
Saddle seatOrange Ti Embroidered
Seat post extension 27.2 (millimeters) Diameter
Orange Stick Up


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....