Signature ZEMOPI 584 1995 VS Merlin CRITICAL PATH 1998 specs comparison
Signature Zemopi 584
General InfosModel | Zemopi 584 |
Manufacturer | Signature |
Year of production | 1995 |
Current price | Check price Here ==> |
Color choice |
-Black chrome |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) - 21 (inches) |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) - 21 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) Ritchey Climb Max |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Dia-Compe PC-3 Levers Dia-Compe 980 Brakes |
Hubs for disc brakes | Shimano STX |
Rims manufacturer | 32-hole Ritchey Vantage Expert |
Spoke nipples type | Not Available |
Spoke wheel | 2.0 (millimeters) Straight Gauge Stainless Steel |
Frame and Body Specs
Frame materials | Double-butted Chromoly |
Frame type | Welded Steel |
Handlebar construction | Alloy |
Handlebar extender | Tranz X |
Handlebar stem details | Hsin Lung Alloy |
Headset size | 1 1/8 (inches) YST 541AE |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG30 |
Bottom bracket shell width | Not Available |
Bottom bracket type | Not Available |
Crankset parts and sizes | 22/32/42 Teeth Shimano STX HyperDrive-C |
Gear shift levers | Grip Shift SRT-400 |
Rear gear set | 11 - 28 Teeth 7-speed |
Signature Zemopi 584 Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 28.6 (millimeters) Shimano STX |
Derailleur (Rear) | Shimano STX |
Fork material | Triple-clamp Crown Aluminum and chromoly |
Fork type | RST 460 |
Other Specs of Signature Zemopi 584
Component group sets | Shimano STX |
Pedals details | Wellgo LU-897 |
Rear shock absorber | Not Available |
Saddle seat | Velo VL-239 |
Seat post extension | 29.6 (millimeters) Diameter Ritchey Expert |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Signature provided us with the latest version of its Zemopi 584 bike manual
- Find All parts, tires and accessories of Signature Zemopi 584 Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here