Specialized ENDURO EXPERT 2003 VS Merlin CRITICAL PATH 1998 specs comparison

Specialized Enduro Expert
General InfosModel | Enduro Expert |
Manufacturer | Specialized |
Year of production | 2003 |
Current price | Check price Here ==> |
Color choice | -Dream Silver |
Sizes | - Small - Medium - Large - Extra large |
Sizes | - Small - Medium - Large - Extra large |
Wheels And Breaking System
Bike front tire | 26 X 2.20 (inches) Specialized Enduro Pro |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano Deore Hydraulic LeversShimano Deore M525 Hydraulic Disc Brakes |
Hubs for disc brakes | Rear: Shimano DeoreFront: Specialized Stout |
Rims manufacturer | 28-hole and 32-holeMavic X223 Disc |
Spoke nipples type | Brass Nipples |
Spoke wheel | 15ga. Straight GaugeDT Stainless Steel |
Frame and Body Specs
Frame materials | Specialized A1 Aluminum |
Frame type | TIG-welded |
Handlebar construction | Specialized MidRise |
Handlebar extender | Optional |
Handlebar stem details | Aluminum Threadless |
Headset size | 1 1/8 (inches) Threadless Aluminum |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-HG73 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 113 (millimeters) SpindleShimano BB-ES30 |
Crankset parts and sizes | 22/32/44 TeethSpecialized Strong Arm |
Gear shift levers | Shimano Deore LX RapidFire SL |
Rear gear set | 11 - 34 Teeth9-speed |
Specialized Enduro Expert Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 34.9 (millimeters)Shimano Deore LX |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Single CrownAluminum |
Fork type | 4.0 (inches)-5.0 (inches) Adjustable TravelFox Talas RL TALAS |
Other Specs of Specialized Enduro Expert
Component group sets | Mountain Mix |
Pedals details | Shimano PD-M515 SPD |
Rear shock absorber | 100/130 (millimeters) TravelFox Float RL |
Saddle seat | Specialized Body Geometry |
Seat post extension | 30.9 (millimeters) DiameterAluminum |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice | -Brushed |
Sizes | - 15 (inches)- 17 (inches)- 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR LeversShimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-holeMavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-buttedWheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches)Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) SpindleShimano BB-M950 |
Crankset parts and sizes | 24/34/46 TeethShimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters)Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp CrownAluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) TravelRock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) DiameterSyncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Specialized provided us with the latest version of its Enduro Expert bike manual
- Find All parts, tires and accessories of Specialized Enduro Expert Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here