Specialized EPIC COMP WOMEN 2007 VS Merlin CRITICAL PATH 1998 specs comparison

Specialized Epic Comp Women
General InfosModel | Epic Comp Women |
Manufacturer | Specialized |
Year of production | 2007 |
Current price | Check price Here ==> |
Color choice |
-Silver |
Sizes |
- Womens large - womens small - womens medium |
Sizes |
- Womens large - womens small - womens medium |
Wheels And Breaking System
Bike front tire | 26 X 2.00 (inches) Specialized Fast Trak Pro |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Avid Juicy 5 Levers Avid Juicy 5 With 160 (millimeters) Rotor Front and Avid Juicy W With 160 (millimeters) Rotor Rear Brakes |
Hubs for disc brakes | Rear: Shimano FH-M525 Disc Front: Specialized Stout Disc |
Rims manufacturer | 32-hole DT Swiss and Specialized X430 |
Spoke nipples type | Alloy |
Spoke wheel | 15ga. Straight Gauge DT Swiss Stainless Steel |
Frame and Body Specs
Frame materials | Specialized M5 ORE Aluminum |
Frame type | TIG-welded |
Handlebar construction | Specialized XC Low Riser |
Handlebar extender | Optional |
Handlebar stem details | Specialized Adjustable |
Headset size | 1 1/8 (inches) Threadless Alloy Sealed |
Gearing Specifications
Bicycle chain | SRAM PC-951 |
Bottom bracket shell width | Not Available |
Bottom bracket type | TruVativ GXP |
Crankset parts and sizes | 22/32/44 Teeth TruVativ Stylo |
Gear shift levers | SRAM X.9 Trigger |
Rear gear set | 11 - 34 Teeth 9-speed |
Specialized Epic Comp Women Fork System Data
Derailleur (Front) | 34.9 (millimeters) Clamp Shimano Deore LX |
Derailleur (Rear) | SRAM X.9 |
Fork material | Single Crown Magnesium and aluminum |
Fork type | 100 (millimeters) Fox F100 RL |
Other Specs of Specialized Epic Comp Women
Component group sets | SRAM X.9/mix |
Pedals details | Shimano PD-M520 |
Rear shock absorber | 100 (millimeters) Specialized Fox Brain Fade |
Saddle seat | Specialized BG Women's |
Seat post extension | 30.9 (millimeters) Diameter 2014 Butted Alloy |
Merlin Critical Path
General InfosModel | Critical Path |
Manufacturer | Merlin |
Year of production | 1998 |
Current price | Check price Here ==> |
Color choice |
-Brushed |
Sizes |
- 15 (inches) - 17 (inches) - 19 (inches) |
Wheels And Breaking System
Bike front tire | 26 X 2.10 (inches) WTB VelociRaptor Kevlar |
Bike rear tire | Not Available |
Bike wheel size | 26 (inches) Wheels |
Brakeset type | Shimano XTR Levers Shimano XTR V-Brake Brakes |
Hubs for disc brakes | Shimano XTR |
Rims manufacturer | 32-hole Mavic 217 SUP |
Spoke nipples type | Alloy Nipples |
Spoke wheel | 2.0 (millimeters) Double-butted Wheelsmith Stainless Steel |
Frame and Body Specs
Frame materials | 3Al and 2.5V Titanium |
Frame type | TIG-welded |
Handlebar construction | Syncros Hardcore |
Handlebar extender | Optional |
Handlebar stem details | Syncros Hardcore |
Headset size | 1 1/8 (inches) Threadless Chris King NoThreadSet |
Gearing Specifications
Bicycle chain | 1/2 X 3/32 (inches) Shimano CN-IG90 |
Bottom bracket shell width | 68 (millimeters) English |
Bottom bracket type | 112.5 (millimeters) Spindle Shimano BB-M950 |
Crankset parts and sizes | 24/34/46 Teeth Shimano XTR M950 |
Gear shift levers | Shimano XTR RapidFire SL |
Rear gear set | 11 - 34 Teeth 8-speed |
Merlin Critical Path Fork System Data
Derailleur (Front) | Bottom-pull and clamp-on 35.0 (millimeters) Shimano XTR |
Derailleur (Rear) | Shimano XTR SGS |
Fork material | Triple-clamp Crown Aluminum and magnesium |
Fork type | Rock Shox Indy SL |
Other Specs of Merlin Critical Path
Component group sets | Shimano XTR |
Pedals details | Optional |
Rear shock absorber | 3.5 (inches) Travel Rock Shox Super Deluxe |
Saddle seat | Bontrager With Titanium Rails |
Seat post extension | 27.2 (millimeters) Diameter Syncros Hardcore Aluminum |
Useful links and guides ....
- To know more about this exacte bike, Specialized provided us with the latest version of its Epic Comp Women bike manual
- Find All parts, tires and accessories of Specialized Epic Comp Women Mountain bike here
- Get your Merlin Critical Path manual book version yo know further about this bike
- Saddles, tires And mechanical parts for Merlin Critical Path Mountain bike here