Univega DS-950 1998 VS Merlin CRITICAL PATH 1998 specs comparison

Univega DS-950 1998 comparison online with competitors

Univega DS-950

General Infos
Model DS-950
Manufacturer Univega
Year of production 1998
Current price Check price Here ==>   
Color choice -Ripe Mango with black swingarm
Sizes - 16 (inches)
- 18 (inches)
- 20 (inches)
Sizes - 16 (inches)
- 18 (inches)
- 20 (inches)

Wheels And Breaking System

Bike front tire26 X 2.00 (inches) WTB Primal Raptor
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Tektro RBP-375A Levers
Shimano STX-RC V-Brake Brakes
Hubs for disc brakesShimano STX-RC
Rims manufacturer 32-hole
Weinmann Zac 19
Spoke nipples typeBrass Nipples
Spoke wheel 1.8 (millimeters) Straight Gauge
Chung Nan Stainless Steel

Frame and Body Specs

Frame materials7005 aluminum c
Frame typeTIG-welded With Unified Rear Triangle
Handlebar construction Butted
Aluminum
Handlebar extender Ski Bend
Aluminum
Handlebar stem detailsTIG-welded Aluminum
Headset size1 1/8 (inches) Threadless Tange-Seiki RBC-2

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
KMC SS-82
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 110.5 (millimeters) Spindle
Shimano BB-LP27
Crankset parts and sizes 22/32/42 Teeth
Sugino Impel 350
Gear shift leversShimano STX-RC RapidFire SL
Rear gear set 12 - 28 Teeth
8-speed

Univega DS-950 Fork System Data

Derailleur (Front) Top-pull and clamp-on 31.8 (millimeters)
Shimano STX-RC Top-swing
Derailleur (Rear)Shimano Deore LX SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy C

Other Specs of Univega DS-950

Component group setsShimano Deore LX and STX-RC
Pedals detailsAluminum Cage With Clips & Straps
Rear shock absorber 3.0 (inches) Travel
RST 22
Saddle seat Chromoly Rails
WTB SSTX
Seat post extension 27.2 (millimeters) Diameter
Aluminum Pro-clamp Micro-adjust


Merlin Critical Path 1998 comparison online with competitors

Merlin Critical Path

General Infos
Model Critical Path
Manufacturer Merlin
Year of production 1998
Current price Check price Here ==>   
Color choice -Brushed
Sizes - 15 (inches)
- 17 (inches)
- 19 (inches)

Wheels And Breaking System

Bike front tire26 X 2.10 (inches) WTB VelociRaptor Kevlar
Bike rear tireNot Available
Bike wheel size26 (inches) Wheels
Brakeset type Shimano XTR Levers
Shimano XTR V-Brake Brakes
Hubs for disc brakesShimano XTR
Rims manufacturer 32-hole
Mavic 217 SUP
Spoke nipples typeAlloy Nipples
Spoke wheel 2.0 (millimeters) Double-butted
Wheelsmith Stainless Steel

Frame and Body Specs

Frame materials3Al and 2.5V Titanium
Frame typeTIG-welded
Handlebar constructionSyncros Hardcore
Handlebar extenderOptional
Handlebar stem detailsSyncros Hardcore
Headset size1 1/8 (inches) Threadless Chris King NoThreadSet

Gearing Specifications

Bicycle chain 1/2 X 3/32 (inches)
Shimano CN-IG90
Bottom bracket shell width68 (millimeters) English
Bottom bracket type 112.5 (millimeters) Spindle
Shimano BB-M950
Crankset parts and sizes 24/34/46 Teeth
Shimano XTR M950
Gear shift leversShimano XTR RapidFire SL
Rear gear set 11 - 34 Teeth
8-speed

Merlin Critical Path Fork System Data

Derailleur (Front) Bottom-pull and clamp-on 35.0 (millimeters)
Shimano XTR
Derailleur (Rear)Shimano XTR SGS
Fork material Triple-clamp Crown
Aluminum and magnesium
Fork typeRock Shox Indy SL

Other Specs of Merlin Critical Path

Component group setsShimano XTR
Pedals detailsOptional
Rear shock absorber 3.5 (inches) Travel
Rock Shox Super Deluxe
Saddle seatBontrager With Titanium Rails
Seat post extension 27.2 (millimeters) Diameter
Syncros Hardcore Aluminum


Useful links and guides ....